| 2002-09-06 00:00:00 | ***************** UNSAT *************** |
| | |
| | 1)NOTE: PLEASE NOTE PLANS ARE NOT |
| | COMPLETED FOR REVIEW. PANEL SCHEDULES |
| | ETC. |
| | |
| | 2)NOTE: PLEASE NOTE THAT ELECTRICAL |
| | POWER PLANS AND RISER DIAGRAM DO NOT |
| | CORRELATE. |
| | |
| | 3)NOTE: PLEASE NOTE SOME EQUIPMENT |
| | GROUNDING CONDUCTORS SHOWN BETWEEN |
| | GUTTER(S)/METER AND MAIN DISC`S. THIS |
| | IS PARALLELING THE NEUTRAL WHICH IS NOT |
| | PERMITTED. PLEASE SEE 250-24. |
| | |
| | 4)NOTE: PLEASE CLARIFY CONDUCTORS ON |
| | RISER DIAGRAM. SOME SHOWN AS ALUM AND |
| | OTHERS AT COPPER? PLEASE NOTE AMPERAGE |
| | RATINGS OF ALUM CONDUCTORS PER 310-16 |
| | SOME AREAS ON RISER MISSING CONDUCTORS/ |
| | SIZES SHOWN. |
| | |
| | |
| | 5)NOTE: PLEASE NOTE POWER PLAN SHOWS |
| | A NEW SERVICE AT ONE LOCATION AND ALSO |
| | SHOWS SERVICE EQUIPMENT COMING FROM |
| | EXISTING PANELS THAT ARE NOT SHOWN AS |
| | NEW?? PLEASE SEE PLASN AND CORRELATE. |
| | |
| | 6)NOTE: PLEASE CLARIFY METHOD(S) FOR |
| | GROUNDING ELECTRODES?? 250-50 |
| | |
| | 7)NOTE: PLEASE CLARIFY LOAD CALCS |
| | SHOWING "TWO PHASE"?? |
| | |
| | 8)NOTE: PLEASE SUBMIT AIC RATINGS FOR |
| | ALL NEW EQUIPMENT BEING INSTALLED. |
| | PLEASE NOTE MAINS/PANELS/BRKRS ALL |
| | MUST BE RATED FOR THE AVAILABLE FAULT |
| | CURRENT. 110-9 |
| | |
| | PLEASE NOTE THAT WHEN PLANS ARE |
| | COMPLETED, A FULL REVIEW CAN ONLY THEN |
| | TAKE PLACE. IF THERE ARE ANY QUESTIONS, |
| | PLEASE CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-659-8096 EXT 8372 |
| | |
| | |
| | PLEASE NOTE PER FS/FAC 471.025/ 61G15- |
| | 23.002 |