| Plan Review Notes For Permit 02080894 |
| Permit Number |
02080894 |
|
| Review Stop |
R |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2002-10-25 00:00:00 | APPROVED WITH PROVISO: | | | 1-FLOOD ZONE A8. WILL NEED THE ELEVATION | | | CERTIFICATE. | | | 2-STORM SHUTTERS: A)REVISE INSTALLATION | | | SCHEDULE: 1)OPENINGS TO MATCH FLOOR | | | PLANS. 2)CLARIFY DESIGN PRESSURES (SEE | | | ARCHITECTURAL PLANS). 3)CLARIFY TYPE | | | OF ANCHOR TO BE USED). 4)CLEARLY MARK | | | ON STORM SHUTTER DRAWINGS THE SPECIFIC | | | MOUNTING CONDITIONS AND ANCHOR TYPE & | | | SPACING TO BE USED. | | | 3-PROVIDE COMPLETE UL SPECIFICATIONS FOR | | | 1 HOUR FIRE RATED GLASS BLOCK ASSEMBLY | | | & PROVIDE LEGIBLE PRODUCT APPROVAL FOR | | | GLASS BLOCK. |
|