| Date |
Text |
| 2002-11-06 00:00:00 | BUILDING REVIEW APPROVED WITH PROVISO: |
| | 1-STORM SHUTTERS: A)DESIGN PRESSURES |
| | SPECIFIED HAVE LIMITATIONS FOR PANEL |
| | SPAN. SEE PLANS FOR CALCULATED DESIGN |
| | PRESSURES AND REVISE AS REQUIRED. |
| | B)CLARIFY TYPE OF ANCHOR USED. RAWL OR |
| | CAULK-IN. |
| | C)MARK ON DWGS THE SPECIFIC MOUNTING |
| | CONDITIONS AND ANCHOR TYPE & SPACING |
| | TO BE USED. |
| | 2-PROVIDE PRODUCT APPROVAL FOR ENTRY |
| | DOOR WITH SINGLE SIDELITE ASSEMBLY AS |
| | SHOWN ON PLANS. |
| | 3-PROVIDE COMPLETE UL LISTING AND SPECS |
| | FOR ONE HOUR FIRE RATED GLASS BLOCK |
| | ASSEMBLY AS REQUIRED BY TABLE 600 FBC. |
| | **ALSO, PROVIDE CLEAR & LEGIBLE PRODUCT |
| | APPROVAL FOR GLASS BLOCK. |
| | **NOTE: IF GLASS BLOCK FACE THICKNESS IS |
| | LESS THAN 0.25", THEN SAFETY GLASS IS |
| | REQUIRED. SEC. 2405.2.2. FBC 2001. |
| | 4-ENERGY CALCULATIONS WERE NOT REVISED. |
| | REVISE UNDER ATTIC AREA AS REQUIRED BY |
| | SEC. 602.1.ABC.1.2 OF CHAPTER 13 FBC. |
| | OWNER/AGENT TO SIGN AND DATE FORM ALSO |
| | 5-FOUNDATION PLAN AND FOOTING SCHEDULE |
| | DON'T MATCH. REVISE AS REQUIRED. |
| | **ALSO, FOOTING SCHEDULE & WALL SECTIONS |
| | DON'T MATCH. SEE DIMENSIONS FOR LENGTH |
| | AND WIDTH AND REVISE AS REQUIRED. |