| 2002-08-29 00:00:00 | BUILDING PLAN REVIEW |
| | *******DENIED******* |
| | |
| | 1) STRUCTURE IS LOCATED IN AN "AO" FLOOD |
| | ZONE AN ELEVATION CERTIFICATE WILL BE |
| | REQUIRED. |
| | |
| | 2) PROVIDE A DETAIL INDICATING HOW A/C |
| | EQUIPMENT WILL BE SUSPENDED FROM THE |
| | TRUSSES. THIS INFORMATION IS ALSO TO BE |
| | PROVIDED TO THE TRUSS ENGINEER. |
| | |
| | 3)PROVIDE (2) CURRENT AND COMPLETE |
| | COPIES OF SBCCI OR METRO-DADE PRODUCT |
| | APPROVALS FOR: |
| | - ARCHED TOP FIXED GLASS WINDOW SHOWN ON |
| | PLANS AT BEDROOM #3. |
| | - STORM PANELS (PRODUCT APPROVAL WAS NOT |
| | WITH THE KEY PLAN AND INSTALLATION |
| | SCHEDULE) |
| | |
| | 4) NO UPLIFT VALUES OR TRUSS ANCHORS ARE |
| | SPECIFIED ON THE ROOF FRAMING PLAN ON |
| | 3A. THE ANCHORAGE SCHEDULE ON 3A |
| | SPECIFIES THAT CONNECTORS B OR F BE USED |
| | UNLESS OTHERWISE NOTED. PLEASE CLARIFY |
| | IF THESE CONNECTORS WILL BE ADEQUATE TO |
| | RESIST ALL LOADS. |
| | |
| | 5) THE LINTEL OVER THE SLIDING GLASS |
| | DOOR AT THE LIVING ROOM IS NOT SHOWN ON |
| | THE ROOF FRAMING PLAN ON 3A. PLEASE |
| | PROVIDE A PRECAST LINTEL SCHEDULE FOR |
| | LINTELS THAT ARE BEING USED. |
| | |
| | 6) THE COVERED ENTRY DETAIL ON 3A SHOWS |
| | THE TRUSSES SITTING ON THE CONCRETE |
| | BETWEEN THE 2X8 PLATES. ARE THE PLATES |
| | CONTINOUS WITH THE TRUSSES SITTING ON |
| | TOP OF THEM? PLEASE CLARIFY. |
| | |
| | 7) PROVIDE A DETAIL OF THE INTERIOR WOOD |
| | FRAME BEARING WALLS. INDICATE ANCHORS, |
| | CONNECTORS, ETC. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)659-8096 EXT.8202 |