| 2002-08-29 00:00:00 | BUILDING PLAN REVIEW |
| | *******DENIED******* |
| | |
| | 1) STRUCTURE IS LOCATED IN AN "AO" FLOOD |
| | ZONE AN ELEVATION CERTIFICATE WILL BE |
| | REQUIRED. |
| | |
| | 2) THE SURVEY SHOWS THE A/C PAD AND |
| | CONDENSING UNIT LOCATED IN A DRAINAGE |
| | EASEMENT. AN EASEMENT RELEASE IS |
| | REQUIRED OR A REVISED SURVEY SHOWING |
| | RELOCATED EQUIPMENT. |
| | |
| | 3) PROVIDE DETAIL INDICATING HOW A/C |
| | EQUIPMENT IS TO SUSPENDED FROM TRUSSES. |
| | THIS INFORMATION IS ALSO TO BE PROVIDED |
| | TO THE TRUSS ENGINEER. |
| | |
| | 4)PROVIDE (2) CURRENT AND COMPLETE |
| | COPIES OF SBCCI OR METRO-DADE PRODUCT |
| | APPROVALS FOR: |
| | - ARCHED TOP FIXED GLASS WINDOW SHOWN ON |
| | PLANS AT BEDROOM #3. |
| | - STORM PANELS (PRODUCT APPROVAL WAS NOT |
| | WITH KEY PLAN AND INSTALLATION SCHEDULE) |
| | |
| | 5) NO UPLIFT VALUES OR ANCHORS ARE |
| | SPECIFIED ON THE ROOF FRAMING PLAN ON |
| | 3A. THE ANCHORAGE SCHEDULE ON 3A NOTES |
| | THAT CONNECTOR B OR F BE USED UNLESS |
| | OTHERWISE NOTED ON FRAMING PLAN. PLEASE |
| | CLARIFY IF THESE CONNECTORS WILL BE |
| | ADEQUATE TO RESIST ALL LOADS. |
| | |
| | 6) THE LINTEL OVER THE SLIDING GLASS |
| | DOOR AT THE LIVING ROOM IS NOT SHOWN ON |
| | THE ROOFING PLAN ON 3A. PLEASE PROVIDE |
| | A PRECAST LINTEL SCHEDULE FOR THE TWO |
| | LINTELS ON PLANS. |
| | |
| | 7) THE COVERED ENTRY DETAIL ON 3A SHOWS |
| | THE TRUSSES SITTING ON THE CONCRETE TIE |
| | BEAM BETWEEN THE 2X8 PLATES. ARE THE |
| | PLATES CONTINOUS WITH THE TRUSSES |
| | SITTING ON TOP OF THEM. PLEASE CLARIFY. |
| | |
| | 8) PROVIDE A DETAIL OF THE INTERIOR WOOD |
| | FRAME BEARING WALLS. INDICATE ANCHORS, |
| | CONNECTORS,ETC. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)659-8096 EXT.8202 |