| Date |
Text |
| 2002-10-31 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | |
| | 1) SHT D-1.0 DEMO NOTES #4, ALL CAPPED |
| | PLUMBING PIPES SHALL BE INSPECTED PRIOR |
| | TO COVERING. |
| | 2) SHT A-1.1 GARAGE FLOOR PLAN, MANUF. |
| | INFO REQUIRED FOR TANKLESS WATER HEATER. |
| | 3) SHT A-1.1 GARAGE FLOOR PLAN, PLEASE |
| | SUBMIT MANUF. INFO FOR GAS WATER HEATER. |
| | SHOW DETAIL FOR VENTING. IS THIS A DIR- |
| | ECT VENT SYSTEM? |
| | 4) SHT E-1 PLUMBING NOTES #8, AIR CHAMB- |
| | ERS ARE NOT APPROVED. PLEASE DELETE REF- |
| | ERENCE. WATER HAMMER ARRESTORS TO BE IN- |
| | STALLED PER 604.9. W/M - DISHWASHER - |
| | ICE MAKER. |
| | 5) SHT E-1 SANITARY RISER DIAGRAM DOES |
| | NOT MEET CODE. PLEASE SUBMIT A RISER DIA |
| | GRAM THAT MEETS CODE REQUIREMENTS. (SEE |
| | ATTACHED SHEET FOR EXAMPLE) |
| | 6) ENCLOSED USABLE SPACE SHALL BE PER- |
| | MITTED UNDER STAIRS PROVIDED THE SPACE |
| | IS SEPARATED FROM THE STAIR ENCLOSURE BY |
| | THE SAME FIRE RESISTANCE AS THE EXIT EN- |
| | CLOSURE. SEC 1006.1.4 EXCEPTION (1). |
| | 7) GAS PERMIT REQUIRED. SEE FOLLOWING |
| | GAS PERMIT APPLICATION REQUIREMENTS. |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | GAS CODE. |
| | 2. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | 3) TYPE OF GAS, (LP OR NATURAL) |
| | 4. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | FBC-2001 FUEL GAS CODE SECS. 401.8 THRU |
| | 402.5.2 & TABLES 402.2(1) THRU 402(34). |
| | 5. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES (A)(3). |
| | 6. SUBMIT CALCULATIONS FOR COMBUSTION |
| | AIR PER FBC-2001 FUEL GAS CODE SEC 304. |
| | 7. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2001 GAS CODE SEC. 402.2. IF |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | 8. SUBMIT A DETAIL SHOWING THE TYPE, |
| | LOCATION, SIZE AND TERMINATION OF THE |
| | GAS VENTS PER FBC-2001 FUEL GAS CODE SEC |
| | 502 THRU 506. |
| | 10. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | 11. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 659-8096 EXT 8377 |