| Plan Review Notes For Permit 02060883 |
| Permit Number |
02060883 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2002-06-18 00:00:00 | *******************DENIED*************** | | | | | | 1. PROVIDE MANUFACTURER INSTALLATION | | | INSTRUCTIONS FOR THE "3M FIREWRAP OR | | | EQUAL". | | | | | | 2. PLAN SHEET 3 OF 4, PLEASE CLARIFY | | | EF-1 LOCATION TO THE PROXIMITY TO | | | SF-1.(10 FT MINIMUM REQUIRED) | | | | | | 3. EXHAUST SHALL HAVE A MINIMUM OF 10 FT | | | CLEARANCEFROM ADJACENT BUILDINGS, | | | PROPERTY LINES, OR AIR INTAKES AS | | | PER 2001 FBC(M) 506.3.14.3 & NFPA 96 | | | 4-8.2.1 (A). | | | | | | 4. THE AIR VELOCITY THROUGH THE DUCT | | | SHALL NOT BE LESS THAN 1,500 FPM & | | | NOT GREATER THAN 2,500 FPM AS PER | | | 2001 FBC(M) 506.3.6 | | | | | | 5. MAKEUP AIR TEMPERATURE SHALL COMPLY | | | WITH 2001 FBC(M) 508.1.1. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT 659-8096 | | | EXT. 8388. |
|