| 2002-08-14 00:00:00 | 1) PREVIOUS FIRE PLAN REVIEW COMMENTS |
| | # 1,2,AND 3 ARE TO BE NOTED ON THE |
| | PLANS. |
| | |
| | 2) YOUR RESPONSE TO FIRE PLAN REVIEW |
| | COMMENT # 4 IS NOT ADEQUATE. PLEASE |
| | ADVISE AND REVISE AS NECESSARY. |
| | |
| | 3) YOUR RESPONSE TO FIRE PLAN REVIEW |
| | COMMENT # 5 IS NOT ADEQUATE. PLEASE |
| | ADVISE AND REVISE. |
| | |
| | 4) PLEASE PROVIDE PRESCRIPTIVE CODE |
| | REQUIREMENTS FOR THE HANDRAILS AND |
| | GAURDRAILS. |
| | |
| | 5) YOUR RESPONSE TO FIRE PLAN REVIEW |
| | COMMENT # 12 IS NOT ADEQUATE. THE CODE |
| | DOES NOT SPECIFY OPEN SHAFTS, BUT |
| | SHAFTS THAT ARE LARGE ENOUGH FOR PERSONS |
| | TO FALL INTO. PLEASE REVISE PLANS FOR |
| | THE REQUIRED SIGNAGE. |
| | |
| | 6) NO MEP PLAN REVIEW COMMENTS COULD |
| | BE LOCATED. INFORMATION INDICATED THAT |
| | CERTAIN RESPONSES TO PLAN REVIEW |
| | COMMENTS COULD BE LOCATED THERE. PLEASE |
| | ADVISE. |
| | |
| | 7) THE 2.65 POUNDS SHOWN ON THE FIRE |
| | SPRINKLER HYDRAULIC CALCULATIONS FOR |
| | A SAFETY MARGIN IS NOT ACCEPTABLE. |
| | PLEASE REVISE CALCULATIONS AS NECESSARY. |
| | |
| | 8) NO LEGAL PAPERWORK PROVIDED WITH |
| | REGARDS TO THE SINGLE FIRE PUMP THEORY. |
| | |
| | 9) PLEASE EXPLAIN 12" CURB AT TOP OF |
| | STAIR. |
| | |
| | 10) A SMOKE DETECTOR IS REQUIRED ABOVE |
| | FIRE ALARM CONTROL PANEL. |
| | |
| | 11) AN EMERGENCY LIGHT FIXTURE IS |
| | REQUIRED IN THE FIRE PUMP ROOM. |
| | |
| | 12) A MEETING IS TO BE SCHEDULED FOR |
| | THE EXITING OF THE BUILDING. |
| | |
| | MIKE CARSILLO, ASSISTANT FIRE MARSHAL |
| | 659-8096,EXT.8497 |
| | 835-2910 |