| 2002-08-13 00:00:00 | CHECKLIST: |
| | 1-PROVIDE ENGINEERING ANALYSIS & CALCS. |
| | CLARIFY HOW ARE WIND LOADS BEING |
| | TRANSFERED TO THE FLOOR AND CEILING |
| | DIAPHRAGMS. SEE SECTIONS 1606.2.4, |
| | 2105 AND 2107 FBC 2001. |
| | 2-NEED RECORDED NOTICE OF COMMENCEMENT. |
| | 3-SEE COMMENTS ON PLANS. PLEASE RETURN |
| | REVIEWED SET AFTER CORRECTIONS ARE |
| | DONE TO EXPEDITE REVIEW PROCESS. |
| | 4-SPECIFY FIRECUTS ON STRUCTURAL DWGS |
| | ALSO. SEC. 2305.1.4 FBC 2001. |
| | 5-PROVIDE SOIL TEST REPORT. |
| | 6-PROVIDE COMPLETE INFORMATION FOR STORM |
| | SHUTTERS. NEED KEY PLAN, INSTALLATION |
| | SCHEDULE AND PRODUCT APPROVAL WITH |
| | MATCHING LEGIBLE DRAWINGS. |
| | 7-PROVIDE PRODUCT APPROVAL: |
| | A)ENTRY DOORS WITH LEGIBLE DRAWINGS. |
| | B)ARCHED WINDOWS WITH LEGIBLE DRAWINGS |
| | THAT MATCH THE PRODUCT APPROVAL. |
| | C)GLASS BLOCK COMPLETE UL SPECIFICATIONS |
| | FOR ONE HOUR FIRE RATED ASSEMBLY AS |
| | REQUIRED BY TABLE 600 FBC 2001. |
| | 8-REVISE DETAIL FOR 2X STRUCTURAL BUCK |
| | REQUIRED BY THE PRODUCT APPROVAL. SEE |
| | DETAIL SUBMITTED & DETAIL FOR FRAMING |
| | @ ARCHED OPENINGS. THEY DON'T MATCH. |
| | 9-SPECIFY FIREBLOCKING SIZE AND LOCATION |
| | AT STAIRS, INCLUDING AT TOP OF STAIRS. |
| | SEC. 2305.1.4 FBC 2001. |
| | 10-REVISE CONNECTORS SPECIFIED AT TOP OF |
| | FRAMING WALLS. CONNECTOR SPECIFIED IS |
| | DESIGNED TO BE EMBEDED INTO CONCRETE. |
| | NEED WOOD TO WOOD CONNECTOR. |
| | 11-PROVIDE COMPLETE DETAILS & SPECS FOR |
| | CONSTRUCTION AND INSTALLATION OF WOOD |
| | FRAMED SHEAR WALL. SEE SEC. 2313 FBC. |
| | SPECIFY ALL FASTENERS AT THE ENDS AND |
| | CORNERS. AT FRAMING OF OPENINGS, ETC. |