Plan Review Notes
Plan Review Notes For Permit 02060554
Permit Number 02060554
Review Stop R
Sequence Number 3
Notes
Date Text
2002-08-20 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE ENGINEERING ANALYSIS/CALCS AND
 COMPLETE SECTIONS/DETAILS/SPECS FOR
 DESIGN CLARIFICATION OF GABLE END AT
 FRONT ELEVATION CONSIDERING THAT THE
 CENTER OF GABLE IS MASONRY AND THE TWO
 SIDES ARE WOOD TRUSSES. SEE SECTIONS
 1606.2.4, 2117 AND 2313 FBC 2001.
 2-PROVIDE SOIL TEST REPORT.
 3-PROVIDE COMPLETE & CORRECT INFORMATION
 FOR STORM PANELS UNDER SEPARATE PERMIT
 AS REQUIRED BY CITY HURRICANE STANDARD
 4-PROVIDE PRODUCT APPROVAL FOR DOORS,
 WINDOWS AND WINDOW MULLIONS ASEMBLIES
 AS SHOWN ON PLANS.
 5-PROVIDE UL LISTING AND SPECS FOR ONE
 HOUR FIRE RATED GLASS BLOCK ASSEMBLY
 AS REQUIRED BY TABLE 600 FBC 2001.
 REVISE GLASS BLOCK ASSEMBLY DETAILS AS
 REQUIRED. SEE UL ASSEMBLY SPECS.
 **NOTE: GLASS BLOCK TO BE SAFETY GLAZING
 IF MIN. UNIFORM THICKNESS IS LESS THAN
 0.25". SEC. 2405.2.2 FBC 2001.
 6-SHEET S1: CORRECT LINTEL SPECIFIED FOR
 GARAGE DOOR. THERE ISN'T L-19 ON SCHED
 **NOTE: CHECK THAT LINTEL SCHEDULE MATCH
 OPENINGS SHOWN ON PLANS. EG: CHECK L9
 **SPECIFY SPACING FOR WWM SUPPORTS. SEE
 SEC. 1909.3 FBC 2001.
 7-REVISE/CLARIFY TRUSS ANCHOR SCHEDULE:
 UPLIFT AND LATERAL LOADS TO MATCH USP
 SPECIFICATIONS. SEE USP CATALOGUE.
 PROVIDE ENGINEERED CALCS FOR LOADS
 DIFFERENT THAN THOSE SHOWN BY USP.
 **NOTE: SEE USP INSTALLATION NOTES (PAGE
 40) FOR LIMITATIONS WHEN USING DOUBLE
 ANCHORS (EG: LESS THAN 8" O.C).
 8-CLARIFY WHY BLOCKING & FRONT GABLE END
 IS SHOWN ONLY ON PARTIAL GABLE AND NOT
 ALL THE WAY AT BOTH ENDS.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
 9-DRAWING 9/A-4 SHOWING RECESS OF WINDOW
 TO INSTALL SHUTTERS IS NOT CLEAR.
 PROVIDE COMPLETE DETAIL SHOWING RECESS
 DIMENSIONS. SEE STORM SHUTTERS PRODUCT
 APPROVAL & DRAWINGS TO INDICATE TRACK
 SYSTEM TO BE USED AND EDGE DISTANCE
 AND GLASS SEPARATION REQUIRED.
 10-PROVIDE 2X STRUCTURAL BUCK DETAIL FOR
 FIXED WINDOW. DETAIL SUBMITTED DOESN'T
 APPLY. NEED FOR MASONRY WALL, NOT FOR
 FRAMED WALL.
 11-DIAPHRAGM SCHEDULE: CLEARLY IDENTIFY
 ROOF NAILING ZONES ON FRAMING PLAN.
 12-SEE PRODUCT APPROVAL FOR GARAGE DOOR
 FOR STRUCTURAL BUCK SPECS AND REVISE
 DETAIL AS REQUIRED.
 13-CLARIFY SIZE OF ATTIC VENTS. SEE WALL
 SECTIONS NOTES AND VENT CALCULATIONS.


Account Summary | Usage Policy | Privacy Policy