| 2003-03-20 00:00:00 | ************ UNSAT ***************** |
| | |
| | 1)NOTE: PLEASE SEE PLANS, THERE ARE |
| | STILL MANY RECEPTS MISSING PER 210-52 |
| | PLEASE ALSO SEE KITCHEN COUNTERSPACE |
| | PER 210-52-C1 |
| | |
| | 2)NOTE: PLEASE SEE SOME UNITS HAVE MISS- |
| | -ING SD`S INSIDE BEDROOMS OR ARE MISSING |
| | OUTSIDE. NFPA-72 |
| | |
| | 3)NOTE: MDPL AND MDPHARE SHOWN W/ NO |
| | MAINS?? PLEASE SEE E-503, ONE ? AND |
| | AS MLO. PLEASE SEE 230-70/230-2/230-72 |
| | |
| | 4)NOTE: PLEASE SHOW SIZE OF DS-EQ AND |
| | DS-LS. IT IS NOTED BY ALL NOTES ON |
| | RISER DIAGRAM THAT ATS,EQ&LS MDP`S ARE |
| | ALL 400A.HOWEVER UPON REVIEW OF SEC`S |
| | FROM FPL, EQ HAS ONLY ONE SET OF 3/0`S |
| | WHICH ARE ONLY RATED FOR 200A'S? |
| | PLEASE CLARIFY SIZING OF DISC AND SEC`S |
| | PLEASE ALSO PROVIDE AIC RATINGS FOR BOTH |
| | MAINS. EQ HAS "NOTE 8" FOR GREEN AND |
| | LS DOES NOT HAVE "NOTE 1"? |
| | |
| | 5)NOTE: PLEASE CLARIFY GFI PROTECTION |
| | PER 517-17. IT WAS NOTED THAT GFI |
| | PROTECTION IS NOTED FOR MDPH. NO MAIN? |
| | |
| | 6)NOTE: PLEASE SEE NOTE ON ELECTRICAL |
| | LOAD CALCS. MENTIONS 1ST 10KW@100% AND |
| | REMAINDER AT 40% PER 220-13. |
| | PLEASE SEE 220-13,, REMAINDER IS NOT 40% |
| | NEC SHOWS 50%. |
| | PLEASE CLARIFY/SHOW LOAD CALC FOR MDPH. |
| | E-509 SHOWS MDPA? |
| | |
| | 7)NOTE: PLEASE SUBMIT AND SHOW ALL |
| | CONTINUOUS LOADS AT 125%, 215-3,230-42 |
| | ETC. |
| | |
| | 8)NOTE: PLEASE SEE UNIT PANEL SCHEDULES. |
| | ONLY SHOW ONE SMALL APPL CIRCUIT? |
| | PLEASE SEE NEC 210-11-C1 |
| | |
| | 9)NOTE: PLEASE LIST THE REQ`D ARC FAULT |
| | PROTECTED CIRCUITS ON PANEL SCHEDULES |
| | FOR APT UNIT. 210-12 |
| | |
| | 10)NOTE:PLEASE SEE "TYPICAL" LIST SHOWN |
| | FROM 4WDL, PANELS SHOWN AS "SL`S". |
| | |
| | 11)NOTE: PLEASE SEE UNIT TYPE "S" PANEL |
| | SCHEDULE SHOWN. SHOWN AS BEING #224 |
| | WHEN YO GO TO RISER DIAGRAM, #224 IS |
| | BEING FED FROM "2NDL" AND YET 2NDL PANEL |
| | SCHEDULE DOES NOT SHOW A TYPE "S"?? |
| | PLEASE CORRELATE PANEL SCHEDULES FOR |
| | THIS AND OTHERS. |
| | |
| | 12)NOTE: PLEASE SEE THAT ELECTRICAL |
| | ROOM FOR FIRE PUMP IS SHOWN,BUT NOTHING |
| | SHOWN ON RISER DIAGRAM FOR FIRE PUMP/ |
| | OCP/AWG??? PLEASE ALSO NOTE ON PLANS |
| | OCP FOR FIRE PUMP PER 695-4B-1 |
| | NOT ENOUGH INFORMATION IN SPECS FOR |
| | FIRE PUMP/OCP/SIZE/CODE LETTER ETC. |
| | PLEASE GO OVER PLANS AND REVISE. |
| | PLEASE NOTE DUE TO PLANS NOT BEING |
| | COMPLETE THE FIRST TIME THEY CAME IN. |
| | SOME OF THESE COMMENTS ARE NEW. |
| | |
| | IF THERE ARE ANY QUESTIONS, PLEASE CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |