| 2002-09-11 00:00:00 | *************** UNSAT ************** |
| | |
| | 1)NOTE: PLEASE CLARIFY, COMMENT BACK |
| | FOR GROUNDING ELECTRODE SYSTEM MENTIONS |
| | NO BLDG/FOOTER STEEL IN BLDG? PLEASE |
| | NOTE AS PER VERIFICATION OF JOBSITE, |
| | FOOTER STEEL HAS BEEN INSTALLED. PLEASE |
| | NOTE THAT ANY CONCRETE THAT MAY HAVE |
| | BEEN POURED WILL NEED TO BE CHIPPED OUT |
| | TO ATTACH TO FOOTER STEEL. PER 250-50 |
| | FOUNDATION PERMIT REQ`S ALL CODES TO BE |
| | MET. PLEASE VERIFY IF STEEL AT JOBSITE |
| | MAY ALREADY HAVE GROUNDING ELECTRODE |
| | ATTACHMENT.? |
| | |
| | 2)NOTE: PLEASE NOTE RISER DIAGRAM IS |
| | MISSING METER LOCATION? PLEASE NOTE |
| | MEANS FOR GROUNDING ELECTRODE SYSTEM TO |
| | MEET 250-50/250-24. PLANS SHOW SYSTEM |
| | COMING FROM PANEL"LP_1"? PLEASE NOTE, |
| | NOT PERMITTED PER 250-24 |
| | |
| | 3)NOTE: PLEASE NOTE IT IS NOTED PER |
| | RESPONSE LETTER THAT CIRCUITS FOR TRACK |
| | LIGHTING IS LOADED AT 200VA PERFT BUT |
| | DOES NOT INDICATE THIS IN LOAD CALCS |
| | OR ON PLANS? PLEASE CLARIFY. |
| | |
| | 4)NOTE: PLEASE NOTE CONTINUOUS LOADS, |
| | (LIGHTING) IS NOT SHOWN AT 125%. PLEASE |
| | CLARIFY LOAD FOR 3 OR MORE HOURS> |
| | 215-3/230-42 ETC. |
| | |
| | 5)NOTE: PLEASE NOTE/CLARIFY LOAD SHOWN |
| | FOR PANEL "LP-1". PLEASE CLARIFY LOAD |
| | SHOWN AT 159A`S W/ 150A OCP IN PANEL |
| | "LP-2"? |
| | |
| | 6)NOTE: PLEASE NOTE WIRE SIZE SHOWN FOR |
| | MAIN" LP-2" IS AT 600MCM. PLEASE NOTE |
| | PER 310-16 75 DEGREE COL. RATED FOR 420A |
| | , PLEASE NOTE NEXT STANDARD OCP PER |
| | 240-6 IS 450A. PLEASE NOTE 110-14 FOR |
| | CONNECTION LIMITATIONS OF WIRE RATINGS. |
| | |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE CALL. |
| | |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-659-8096 EXT 8372 |