| 2002-09-09 00:00:00 | DENIED:2ND REQUEST |
| | |
| | PLAN INDOCATS 4 A/C SYSTEMS & EQUIPMENT |
| | SCHEDULE REFLECTS 3 A/C SYSTEMS. |
| | PROVIDE EQUIPMENT INFORMATION FOR A/C |
| | #2. |
| | |
| | MECHANICAL PLAN DOES NOT COINCIDE WITH |
| | THE A-2 FLOOR PLAN - AHU'S 3 & 4 ARE |
| | SHOWN IN OPPOSITE LOCATIONS. |
| | |
| | BALANCED RETURN AIR - 2001 FBC(M) 601.4 |
| | RETURN AIR SHALL BE EQUAL TO SUPPLY |
| | AIR BY MEANS OF AIR TRANSFER OR A RETURN |
| | AIR (JUMPER). |
| | |
| | PRIOR TO CONNECTING NEW DUCTWORK TO |
| | EXISTING DUCTOWRK, CALL FOR AN |
| | INSPECTION. |
| | |
| | WHERE MULTIPLE AIR-HANDLING SYSTEMS |
| | SHARE COMMON SUPPLY OR RETURN AIR DUCTS |
| | OR PLENUMS WITH A COMBINED CAPACITY |
| | GREATER THAN 2,000 CFM, THE RETURN AIR |
| | & SUPPLY SYSTEMS SHALL BE PROVIDED WITH |
| | SMOKE DETECTORS IN ACCORDANCE WITH |
| | SECTION 606.2.1 OR UPON ACTIVATION, THE |
| | SMOKE DETECTORS SHALL SHUT DOWN THE AIR |
| | DISTRUBUTION SYSTEM. 2001 FBC(M) 606.2.2 |
| | & 606.4. |
| | |
| | PLEASE NOTE, DUCTS SHALL NOT BE |
| | INSTALLED IN OR WITHIN 6 INCHES OF THE |
| | GROUND AS PER 2001 FBC(M) 603.12. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT 659-8096 |
| | EXT. 8388. |