| Plan Review Notes For Permit 02050549 |
| Permit Number |
02050549 |
|
| Review Stop |
R |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2002-07-10 00:00:00 | THE MAJORITY OF ITEMS ON THE 5/29/02 | | | CHECKLIST HAVE NOT BEEN ADDRESSED. | | | | | | THE REQUESTED DESIGN LOADS ARE NOT | | | SHOWN ON THE PLANS. | | | | | | THE SHEAR WALL ANALYSIS FOR THE SECOND | | | FLOOR HAS NOT BEEN DONE.THE UNSIGNED, | | | HAND WRITTEN CALCULATIONS ARE WITHOUT | | | STANDING FOR THE SHEARWALL OR THE | | | GLAZING IN THE HAND AND GUARD RAILS. | | | | | | THE HILIGHTED CODE SECTION 2103.1, | | | EXCEPTION #3 IS NOT RELEVANT TO THE | | | REQUIREMENT OF PROVIDING RESPONSIBLE | | | DESIGN CRITERIA FOR REINFORCED MASONRY | | | ON THE PLANS. | | | | | | THE 5/29/02 LIST IS ATTACHED HERE AGAIN. |
|