| 2003-12-15 00:00:00 | DENIED |
| | |
| | 1) THE WINDOW AND DOOR PRESSURES ON A2 |
| | ARE INCORRECT. THE MAXIMUM PRESSURES |
| | FOR THE STRUCTURE ARE THE SAME FOR BOTH |
| | FLOORS AND ARE BASED ON A TWO STORY |
| | STRUCTURE. PLEASE CORRECT. |
| | |
| | 2) THE NEGATIVE PRESSURE SPECIFIED ON |
| | THE PLANS OF -57 PSF EXCEEDS THE |
| | NEGATIVE DESIGN PRESSURES OF THE DOORS |
| | AND THE 35 SINGLE HUNG WINDOWS. SEE THE |
| | PRODUCT APPROVALS. PLEASE CORRECT. |
| | NOTE: REVIEW THE SPECIFIED WIND LOAD |
| | PRESSURES. THE FBC TABLE 1606.2B FOR A |
| | STRUCTURE WITH A MEAN ROOF HEIGHT OF 30' |
| | OR LESS WITH EXPOSURE B LISTS THE |
| | MAXIMUM PRESSURES AS +35.3 AND -47.2 PSF |
| | |
| | 3) THE ID MARKS ON THE DOOR SCHEDULE DO |
| | NOT CORRESPOND TO THE ID MARKS ON THE |
| | PLANS. |
| | |
| | 4) CHANGE THE WINDOW SIZES ON SHEETS A3 |
| | AND P1 TO CORRESPOND WITH A2. |
| | |
| | 5) THE PRODUCT APPROVALS FOR THE JELD- |
| | WEN DOOR, THE SHINGLES AND STORM PANELS |
| | HAVE EXPIRED. SUBMIT CURRENT PRODUCT |
| | APPROVALS. |
| | |
| | 6) THE INSTALLATION SCHEDULE FOR THE |
| | STORM PANELS HAS ERRORS. PLEASE CORRECT. |
| | THE GLAZING IN THE DOORS ARE REQUIRED TO |
| | BE SHUTTERED. SPECIFY THE ANCHOR TYPE |
| | AND REQUIRED SPACING OF THE ANCHORS AS |
| | INDICATED ON THE PRODUCT APPROVAL. |
| | |
| | 7) THE ORIGINAL WET SIGNATURE AND DATE |
| | AS WELL AS THE EMBOSSD SEAL OF THE |
| | ENGINEER ARE REQUIRED ON EACH PAGE OF |
| | PLANS AND ON ALL DRAWINGS FROM HIM. |
| | |
| | 8) PLEASE REVIEW THE EAST & WEST |
| | ELEVATIONS FOR COMPLIANCE WITH FBC |
| | TABLE 600 REQUIREMENTS. THE AREA OF WALL |
| | ALLOWED AS OPENINGS IS 20% ON THE EAST |
| | SIDE AND 40% ON THE WEST SIDE. THE |
| | LARGER EGRESS WINDOWS MAY EXCEED THE |
| | ALLOWABLE AREA. SUBMIT YOUR CALCULATIONS |
| | FOR THESE TWO ELEVATIONS. |
| | |