| Date |
Text |
| 2003-10-20 00:00:00 | BUILDING DENIED |
| | |
| | 1) ENERGY CALCULATIONS ARE REQUIRED TO |
| | BE SIGNED AND DATED BY THE OWNER/AGENT. |
| | FBC CHAPTER 13. |
| | |
| | 2) SPECIFY THE ROOF PITCH, MEAN ROOF |
| | HEIGHT, HEIGHT OF FLOORS AND CEILINGS |
| | ABOVE GRADE ON THE ELEVATIONS. |
| | |
| | 3) THE PRODUCT APPROVALS SUBMITTED ARE |
| | FOR JELD-WEN "GLAZED" EXTERIOR STEEL |
| | DOORS.THE SCHEDULE ON THE PLANS SPECIFY |
| | STANLEY DOORS W/ ACCEPTANCE #00-0512.09. |
| | THE SCHEDULE SPECIFIES ALUMNIUM DOORS. |
| | PLEASE REVISE. |
| | |
| | 4) THE 34 SH WINDOWS SPECIFIED ON THE |
| | PLANS DO NOT PROVIDE THE CLEAR OPENING |
| | SIZE REQUIRED FOR EMERGENCY ESCAPE AND |
| | RESCUE OPENINGS BY FBC 1005.4.4. |
| | |
| | 5) THE PLANS SPECIFY BINNINGS PAN |
| | AMERICAN WINDOWS WITH ACCEPTANCE # |
| | 01-0226.04. THE PRODUCT APPROVALS THAT |
| | WERE SUBMITTED ARE FOR TRACO WINDOWS. |
| | |
| | 6) THE SIZES SPECIFIED IN THE SCHEDULE |
| | FOR THE 14SH, 1/2 33SH AND 1/2 34SH |
| | WINDOWS ARE INCORRECT. PLEASE CORRECT. |
| | |
| | 7) SUBMIT A KEY PLAN AND INSTALLATION |
| | SCHEDULE FOR THE STORM PANELS. INDICATE |
| | THE CONNECTOR TYPE & SPACING AND TYPE OF |
| | MOUNT THAT WILL BE USED. |
| | |
| | 8) THE WALL SECTIONS ON A-5 DO NOT |
| | SPECIFY A CONCRETE CAP WITH HORIZONTAL |
| | REINFORCEMENT OR VERTICAL REINFORCEMENT |
| | AND FILLED CELLS TYING THE STEM WALL TO |
| | THE FOOTER. A CONTINOUS LOAD PATH FROM |
| | THE ROOF TO THE FOOTING IS REQUIRED. |
| | SPECIFY ON THE PLAN HOW THE LOAD WILL BE |
| | TRANSFERED FROM THE TOP OF THE STEM WALL |
| | TO THE FOUNDATION. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |