| 2003-02-28 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | |
| | PLAN REVIEW COMMENTS FROM 5-8-02/10-5-02 |
| | AND 12-5-02 HAVE NOT BEEN ADDRESSED. |
| | |
| | 1) SHT A2, 1 AUTOMATIC CLOTHES WASHER |
| | CONNECTION REQUIRED FOR EACH UNIT OR A |
| | CENTRAL FACILITY WITH 1 CONNECTION PER |
| | 20 UNITS REQUIRED PER TABLE 403.1. |
| | 2) SHT P1, WATER HEATER DETAIL, SHUT OFF |
| | VALVE REQUIRED FOR WATER HEATER. EMERGEN |
| | CY DRAIN PAN REQUIRED FOR ALL HEATERS |
| | ABOVE THE FIRST FLOOR. 3/4" PAN DRAIN |
| | LINE REQUIRED FOR PAN TERMINATING 6" |
| | ABOVE GRADE. |
| | 3) SHT P1 PLUMBING NOTES, #'S 2, 5, 6, |
| | 7, 8, 9, 10, & 11. CURRENT CODE IS FBC- |
| | 2001 PLUMBING NOT SFBC AS STATED IN |
| | NOTES. PLEASE CHANGE NOTES TO REFLECT |
| | PRESENT PLUMBING CODE. |
| | 4) SHT P1 PLUMBING NOTES: NOTE #2 SHEET |
| | Z1 REFERENCED IN NOTE NOT SUBMITTED. |
| | PLEASE SUBMIT ALL SHEETS FOR REVIEW. |
| | 5) SHT P2 1ST & 2ND FLOOR WATER RISER |
| | DIAGRAMS, AIR CHAMBERS ARE NOT APPROVED. |
| | WATER HAMMER ARRESTORS SHALL BE PROVIDED |
| | PER SECTION 604.9 AND LOCATED NEXT TO |
| | THE FIXTURES NOT IN CEILING. |
| | 6) SHT P2 SANITARY RISER DIAGRAM, 2ND |
| | FLOOR BATHROOM GROUP SHALL NOT DRAIN IN- |
| | TO VENT OF 1ST FLOOR BATHROOM GROUP. 2ND |
| | FLOR STACK SHALL BE TAKEN OFF BLDG DRAIN |
| | DOWNSTREAM OF 1ST FLOOR BATHROOM GROUP. |
| | 7) SHT P2 SANITARY RISER DIAGRAM, 3" |
| | VENT REQUIRED FOR MAIN STACK PER SEC. |
| | 903.1 |
| | 8) SEE ATTACHED SHEET - CONCERNING FLA |
| | STATUTE 553.80(2)(B) - ADDITIONAL FEES |
| | SHALL BE IMPOSED AS THIS IS THE FOURTH |
| | TIME THESE COMMENTS HAVE BEEN ADDRESSED. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 659-8096 EXT 8377 |