Plan Review Notes
Plan Review Notes For Permit 02031565
Permit Number 02031565
Review Stop E
Sequence Number 1
Notes
Date Text
2002-03-27 00:00:00PLEASE PROVIDE THE FOLLOWING INFORMATION
 AND RESUBMIT FOR REVIEW:
  
 1} INDICATE THE LOCATION OF THE MAIN
 DISCONNECTS FOR THE BUILDING,AND THE
 NUMBER OF SAME.
  
 2} DIAGRAM SHOWS THE GENERATOR FEEDING
 A SINGLE PHASE TRANSFER SWITCH, PLEASE
 CLARIFY THE TYPE OF GENERATOR BEING
 USED.
  
 3} THE DRAWING INDICATES THE TWO EXISTIN
 G TENENT SPACE PANELS TO BE "MLO",PLEASE
 CLARIFY.
  
 4} INDICATE IF THE GENERATOR IS TO BE
 USED AS A SEPERATELY DERIVED SYSTEM AS
 PER250-20(D).
  
 5} THE DISCONNECT FOR THE LOAD OF THE
 GENERATOR IS INDICATED AS BEING "IN
 UNIT".THIS WOULD TYPICALLY BE LOCKED.IS
 THIS THE ONLY MEANS BEING PROPOSED?
 IS THIS GROUPED WITH THE OTHER MEANS OF
 DISCONNECTS PER 230-72?
  
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 561/659-8096 EXT.8392


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved