Plan Review Notes
Plan Review Notes For Permit 02031079
Permit Number 02031079
Review Stop P
Sequence Number 1
Notes
Date Text
2002-04-19 00:00:00DENIED
 REFERENCE: FBC-2002 PLUMBING - FACBC-97
 FBC-2001 FUEL GAS - NFPA-58
  
 1) SHT A-1 PLEASE SUBMIT TOILET ROOM
 DETAILS. SHOW COMPLIANCE WITH FACBC SEC
 4.16 AND SEC 4.19 AND ALL SUBSECTIONS.
 PLEASE SUBMIT IN A 1/8" OR 1/4" SCALE,
 SHOW W/C'S TO BE 1'6" OFF WALL TO CENTER
 2) SHT A-1 PLEASE SHOW COMPLIANCE WITH
 FACBC SEC 4.15.2, AND SEC 4.1.3(10) FOR
 THOSE WHO HAVE DIFFICULTY BENDING OR
 STOOPING.
 3) SHT P-1, WILL THE EYEWASH ALSO HAVE
 AN EMEMRGENCY SHOWER?
 4) SHTS P-2/P-3 FUNNEL FLOOR DRAIN NOT
 APPROVED. ALL INDIRECT WASTE AND DRIPS
 SHALL DRAIN INTO A FLOOR SINK. 802.2 &
 802.3
 5) SHT P-3 SANITARY RISER DIAGRAM, 2-WAY
 CLEAN OUTS ARE REQUIRED ON PIPES ENTER-
 ING AND EXITING THE GREASE TRAP. SEE
 ATTACHED SHEET FOR APPROVED GREASE TRAP
 DETAIL.
 6) SHT P-3 GEN PLMG NOTES #1 NFPA 58 IS
 FOR L.P. GAS NOT NFPA 54. #3 SIZE TO BE
 BASED ON FBC-2001 FUEL GAS TABLE APPROI-
 ATE FOR LP AND INDICATED PRESSURE.
 7) GREASE TRAP TO BE SIZED BY RODNEY
 COMPO ENVIRONMENTAL COMPLIANCE PER UTIL-
 ITY ORD #2938-96. PLEASE CALL (561)-
 837-4074.
 8) SHT P-4 WATER HEATER DETAIL, DIELECT-
 RIC UNIONS NOT APPROVED.
 9) SEPARATE GAS PERMIT REQUIRED. FOLLOW-
 ING IS LIST OF GAS PERMIT APPLICATION
 REQUIREMENTS NEEDED FOR PERMIT.
 A. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 GAS CODE SEC. 402.4.
 B. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2001 FUEL GAG CODE
 501.13 AND 501.14
 C. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND FBC-2001
 FUEL GAS CODE CHAPTER 6.
 D. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 E. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 10) SHT C1 INDICATES A LP GAS TANK IN
 THE S.W. CORNER, AND SHT P-2 SHOWS LP
 TANKS NEAR THE S.E END OF THE BLDG.
 PLEASE CLAIRFY.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377