| Plan Review Notes For Permit 02030811 |
| Permit Number |
02030811 |
|
| Review Stop |
B |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2003-01-17 00:00:00 | BUILDING REVIEW CHECKLIST: | | | 1-PRODUCT APPROVAL SUBMITTED IS OTHER | | | THAN THE ONE SUBMITTED ORIGINALLY. | | | ENGINEER OF THIS PRODUCT APPROVAL | | | DEMANDS THAT DRAWINGS TO BE SIGNED AND | | | SEALED BY HIM IN ORDER TO BE USED FOR | | | BUILDING PERMIT. SEE NOTE #10 ON SHEET | | | 1 OF 5.ALSO, SINGLE SHEET SUBMITTED | | | DRAWING 02-279 NEEDS TO BE SIGNED AND | | | SEALED BY ENGINEER TO BE USED FOR | | | BUILDING PERMIT. SEE NOTE#9. | | | 2-THIS PERMIT DIDN'T PASS INSPECTIONS | | | BECAUSE APPARENTLY INSTALLATION DIDN'T | | | MATCH PRODUCT APPROVAL SUBMITTED. | | | NEED COORDINATION WITH THE BUILDING | | | INSPECTOR TO VERIFY THAT FIELD CONDI- | | | TIONS MEET THE REQUIREMENTS OF PRODUCT | | | APPROVAL. | | | 3-CLEARLY MARK ON DRAWINGS THE SPECIFIC | | | MOUNTING CONDITIONS AND ANCHOR TYPE | | | & SPACING TO BE USED ACCORDING TO THE | | | MEAN ROOF HEIGHT, DESIGN PRESSURES, | | | EDGE DISTANCE, PANEL SPAN, CONNECTION | | | TYPE AND STRUCTURE TO BE ATTACHED TO. |
|