| 2002-05-16 00:00:00 | ***********DENIED*********************** |
| | |
| | THE FOLLOWING ITEMS HAVE NOT BEEN |
| | CORRECTED FROM THE FIRST REVIEW. |
| | |
| | 1. M-2.01 NO F/D AT 12X8 AND 10X10 DUCTS |
| | INTO VEST SB-004 |
| | 2. M-2.03 NO F/D AT 18X18 DUCT |
| | PENETRATION ABOVE RATED DOORS SERVICE |
| | CORRIDOR G-22 NEAR COLUMN LINES A AND |
| | 2A. |
| | 3. M-2.04 NO F/D (X2) AT 24X24 DUCT INTO |
| | FEC SURFACE ROOM. |
| | 4. M-2.04 NO F/D (X2) AT DUCTS LEAVING |
| | SHAFT BY OFFICE M-18. |
| | 5. M-2.04 NO F/D AT SHAFT BY ELEVATOR |
| | NO. 3. |
| | 6. M-2.04 NO F/D AT (DUCT SIZE COVERED |
| | BY F/D SYMBOL) PENTRATION INTO STORAGE |
| | ROOM M-02. |
| | 7. M-2.04 NO F/D (X2) AT 36X20 AND 60X18 |
| | DUCTS INTO STORAGE RM M-02. |
| | 8. M-2.05 NO F/D AT 12X6 DUCT INTO |
| | VISITORS OFFICE 2-46. |
| | 9. M-2.06 NO F/D AT 12X10 DUCT BY ELEC |
| | RM 3-017. |
| | 10. M-2.06 NO F/D AT 70X24 DUCT INTO |
| | MECH SPACE 3-016. |
| | 11. M-2.06 NO F/D AT 30X20 DUCT |
| | PENETRATION OF SHAFT WALL IN MECH SPACE |
| | 3-020. |
| | 12. M-2.06 NO F/D AT 12X6 DUCT INTO |
| | RESTROOM 3-020 |
| | 13. M-2.06 NO F/D AT 60X18 DUCT INTO |
| | CONFERENCE ROOM 3 F05. |
| | 14. M-2.06 NO F/D AT 50X20 DUCT INTO |
| | FINANCE CUBICLES RM 3 F06. |
| | 15. M-2.06 NO F/D AT 24X8 DUCT (X2 |
| | PLACES) EAST SIDE OF CORRIDOR 3-010. |
| | 16. M-2.06 NO F/D AT 20X14 DUCT INTO |
| | WOMEN'S VESTIBULE 3-006. |
| | 17. M-2.06 NO F/D AT 18X8 DUCT INTO |
| | MEN'S VESTIBULE 3-005. |
| | 18. M-3.01 SHOW LOCATIONS OF REQUIRED |
| | HORN AND STROBE FOR REFRIGERANT LEAK |
| | DETECTION INSIDE AND OUTSIDE OF |
| | MACHINERY ROOM. |
| | 19. M-3.01 WHAT AREA DOES EXISTING AHU |
| | SERVICE? |
| | 20. M-2.06 2 VCV MARKED #14 |
| | 21. M-2.06 NO VCV MARKED #25. |
| | 22. M-2.06 NO VCV MARKED #27M-2.06 VCV |
| | #5 DISTRIBUTION EXCEEDS SCHEDULE. |
| | 23. M-2.06 FCU#8 STIIL SHOWS TWO SUPPLY |
| | DROPS AND NO RETURN. |
| | 24. FLORIDA ENERGY CODE REQUIRES |
| | CHILLERS TO COMPLY WITH TABLE 4-5 (IPLV |
| | MIN. 5.3 DOES NOT SHOW NPLV) |
| | 25. FLORIDA ENERGY CODE REQUIRES FCU TO |
| | COMPLY WITH APPROPRIATE TABLE 4-3 OR |
| | 4-4. |
| | 26. FBC(M) 306.1 REQUIRES CLEARANCE |
| | AROUND EQUIPMENT TO PERMENT |
| | CONTRUCTION SHALL BE SUFFICIENT TO |
| | ALLOW INSPECTION, SERVICE, REPAIR OR |
| | REPLACEMENT WITHOUT REMOVING ELEMENTS |
| | OF PERMANENT CONSTRUCTION. PROVIDE SUCH |
| | CLEARANCES BY ALL EQUIPMENT. |
| | 27. M-2.05 NO VCV#3 , NO VCV #1 TWO |
| | VCV'S LABELED #14. |
| | 28. PLAN SHOWS COIL PULL, NOT ELECTRICAL |
| | SERVICE ACCESS OR ACCESS TO FAN |
| | SECTION |
| | 29. M-2.06 FCU-8 HAS NO |
| | CLEARANCE SHOWN SHOW COMPLIANCE WITH |
| | 306.1 |
| | 30. LAYOUT AND COIL PULL FOR AHU 1 AND 2 |
| | UNCLEAR, IT APPEARS COIL PULL FOR AHU 2 |
| | IS ON TOP OF DUCT FOR AHU 1. PLEASE |
| | CLARIFY SERVICE ACCESS AND COMPLIANCE |
| | WITH 306.1 |
| | 31. CHILLER RELIEF PIPING SHALL COMPLY |
| | WITH FBC(M) 1105.9. |