| Date |
Text |
| 2002-04-05 00:00:00 | **************DENIED******************** |
| | |
| | 1. AHU # 7 HAS NO OUTSIDE AIR VALUE ON |
| | SCHEDULE. |
| | 2. THE LOCATION AND INSTALLATION DETAILS |
| | OF ALL FIRE DAMPERS SHALL BE LOCATED ON |
| | THE PLANS BY THE DESIGNER PER |
| | 2001FBC(M). PLEASE INDICATE ALL FIRE |
| | DAMPERS IN DUCTS PENETRATING RATED |
| | WALLS. |
| | 3. M 203 VCV 2 PLAN CFM = 2275. SCHEDULE |
| | ONLY CALLS FOR 1875 CFM. |
| | 4. M 205 VAV 9 PLAN CFM = 1350. SCHEDULE |
| | ONLY CALLS FOR 1275 CFM. |
| | 5. M 206 VAV 5 DISTRUIBUTION EXCEEDS |
| | SCHEDULE |
| | 6. M 206 VAV 15 2 MARKED ON PLAN, NO 14 |
| | INDICATED. |
| | 7. M206 VAV 15 PLAN CFM= 2000. SCHEDULE |
| | CALLS FOR 1200 CFM. |
| | 8. M 206 (2) VAV 26 SHOWN W/ DIFFERENT |
| | TOTAL CFM ON PLAN |
| | 9. VAV IN CONFERENCE RM 3-X04 NOT |
| | MARKED. |
| | 10. DEFINE FUNCTION OF FCU 8 BOTH DROPS |
| | SHOW SUPPLY AIR, NO PIPING TO UNIT, NO |
| | CFM. |
| | 11. INDICATE EQUIPMENT ENERGY RATING ON |
| | SCHEDULE. |
| | 12. BALANCED AIR RETURN PER FBC(M) |
| | 406.1REQUIRED FOR ALL SPACES. |
| | 13. PROVIDE MECHANICAL ROOM DRAWING FOR |
| | AHU INSTALATION DETAILS AND CLARITY TO |
| | SHOW SERVICE ACCESS REQUIREMENTS |
| | INCLUDING COIL PULL AND OTHER REQUIRED |
| | FLOOR AREA TO BE LEFT OPEN FOR SERVICE. |
| | 14. M 301. PROVIDE INFORMATION ON RELIEF |
| | PIPING TERMINATION FOR CHILLER |
| | EQUIPMENT. |
| | 15. PROVIDE REFRIGERANT INFORMATION |
| | INCLUDING QUANTITIES AND VENTILATION |
| | CALCULATIONS FOR COMPLIANCE WITH FBC(M) |
| | CH 11. |