| Date |
Text |
| 2002-07-08 00:00:00 | THE INFORMATION ON THE "REDDI-FORM |
| | SYSTEM" WAS PREVIOUSLY REQUESTED TWICE. |
| | IT IS STILL ABSENT. |
| | |
| | THE PLANS RESUBMITTED 6/19/02 UNDER THE |
| | SEAL AND SIGNATURE OF WALTER KARPINIA, |
| | PE, DO NOT HAVE ENOUGH STRUCTURAL |
| | DETAILS. |
| | |
| | SHEET A1 DECLARES ON THE FOUNDATION |
| | PLANA - 10" POST AND BEAM STRUCTURAL |
| | SYSTEM AS PER REDDI-FORM STAY IN PLACE |
| | INSULATED WALL SYSTEM.SEE CHAPTER |
| | 61G15-31 RESPONSIBILITY RULES OF |
| | PROFESSIONAL ENGINEERS CONCERNING THE |
| | DESIGN OF STRUCTURES.WITH REGARDS TO |
| | DELEGATED DESIGN RESPONSIBILTY AND |
| | GENERAL RESPONSIBILITY. |
| | |
| | THE THICKNESS OF THE CONCRETE AND THE |
| | INSULATION IS NOT SHOWN.HOW IS THE |
| | INSULATION ADDRESSED WHEN THE VARIOUS |
| | STRUCTURAL COMPONENTS ARE ATTACHED TO |
| | THE WALL? |
| | |
| | SHEET A2 DECLARES #5 VERT @ 12" OC AND |
| | #5 HORIZ @ 48" OC.THERE ARE NO |
| | DETAILS FOR CORNERS, FOUNDATION |
| | CONNECTION, OR INTERUPTION AT OPENINGS. |
| | |
| | PROVIDE AN EVALUATION REPORT LISTING |
| | FOR THE SIMPSON ICFLC/ICFLC-W LEDGER |
| | BRACKETS. |
| | |
| | SHEET A3 WHAT IS THE EMBED DEPTH OF THE |
| | 5/8" BOLT FOR THE LEDGER SUPPORTING THE |
| | PORCH ROOF? |
| | |
| | THE BUILDING CODE IN EFFECT IS THE FBC |
| | NOT SBCCI. |