| Plan Review Notes For Permit 02030183 |
| Permit Number |
02030183 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2002-04-05 00:00:00 | THE ADDITION OF A SECOND STORY WILL | | | CAUSE THIS BUILDING TO EXCEED THE | | | ALLOWABLE ARE FOR A TWO STORY GROUP F | | | OCCUPANCY, TYPE IV, FS CONSTRUCTION AS | | | PROVIDED FOR IN FBC TABLE 500.THIS | | | PROPOSED WORK DOES NOT COMPLY WITH | | | MEZZANINE REQUIREMENTS SO IT WAS NOT | | | REVIEWED IN THAT CONTEXT. | | | | | | WHAT WILL THE USE OF THIS SPACE BE?SEE | | | FBC 104.3.1.1 FOR THE MINIMUM REVIEW | | | CRITERIA, AND ADDRESS THE ITEMS | | | PERTINENT TO THIS WORK.SEE ALSO FBC | | | 1606.1.7 INFORMATION ON DRAWINGS. | | | | | | THIS BUILDING WAS CONSTRUCTED AS A | | | FACTORY INDUSTRIAL OCCUPANCY, IT | | | APPEARS THAT THE PROPORTION OF OFFICE | | | USE, GROUP B, MAY RESULT IN A CHANGE OF | | | OCCUPANCY.THE CHANGE MUST MEET THE | | | BUILDING CODE RESQUIREMENTS FOR THAT | | | USE AND IMPACT FEES ADJUSTED WITH THE | | | COUNTY. |
|