| Date |
Text |
| 2002-04-04 00:00:00 | A PERMIT TO CONSTRUCT MAY NOT BE ISSUED |
| | UNLESS THE FIRE PROTECTION DESIGN IS |
| | INCLUDEDWITH THE PLANS AND REVIEWED |
| | FOR CODE COMPLIANCE.THIS INCLUDES THE |
| | FIRE ALARM SYSTEM, FIRE SPRINKLER |
| | SYSTEM AND ANY OTHER PERTINENT ITEMS. |
| | THIS IS IN ACCORDANCE WITH FLORIDA |
| | STATUTES TITLE XXXIII CHAPTER 553 |
| | SECTION 553.79 (2) |
| | |
| | FURTHER, THE FIRE PROTECTION PLANS MUST |
| | BE PREPARED, SIGNED, SEALED AND DATE BY |
| | FLORIDA REGISTERED FIRE PROTECTION |
| | ENGINEER.SEE CHAPTER 61-G15-32, |
| | RESPONSIBILITY RULES OF PROFESSIONAL |
| | ENGINEERS CONCERNING THE DESIGN OF |
| | FIRE PROTECTION SYSTEMS OF THE FLORIDA |
| | ADMINISTRATIVE CODE. |
| | |
| | THE PREVIOUS REQUEST FOR THE TYPE AND |
| | QAUNTITIES OF THE COMMODITIESTO BE |
| | STORED AS DESCRIBED IN SBC AND NFPA |
| | PUBLICATIONS, A GROUP H OCCUPANCY MUST |
| | BE ASSUMEDAS IS DISCUSSED IN THE TVA |
| | LETTER DATED FEBRUARY 14, 2002.A |
| | "PERFORMANCE BASED" DESIGN MUST BE |
| | APPROVED BY THE BUILDING OFFICIAL AS |
| | PROVIDED FOR IN SBC 103.7, ALTERNATE |
| | MATERIALS AND METHODS. |
| | |
| | THE MULVANNY G2 PERMIT PLAN PREVIEW |
| | COMMENTS RESPONSES, (NON DATE) IN |
| | ADDRESSINGTHE QUESTION OF QUANTITY OF |
| | PALLET STORAGE MAKES REFERENCE TO |
| | PARAGRAPH 6.4 OF THE TVA REPORT WHICH |
| | IN TURNPROVIDES ONLY ONE DIMENSION, |
| | HEIGHT, WHICH IS INSUFFICIENT |
| | INFORMATION AS TO THE VOLUME OF IDLE |
| | PALLET STORAGE. |
| | |
| | TEST AND ACCEPTANCE REPORTS WILL BE |
| | NECESSARY FOR THE "BRISTOL SKYLIGHTS" |
| | AS WELL AS THE REMINDER OF THE WINDOWS |
| | AND THE DOORS TO BE USED IN THE |
| | BUILDING. |
| | |
| | STRUCTURAL CALCULATIONS BY ENGINEERS |
| | NORTHWEST, OF SEATTLE, WA. INDICATE A |
| | REVIEW FOR ASCE 7-95, THE MULVANNY |
| | RESPONSE BOOK DECLARES ASCE 7-95, AND |
| | SHEET S1.0 REMAINS SOMEWHAT NEBULOUS AS |
| | TO WHICH METHOD OF WIND DESIGN WAS |
| | USED.THE SPECIFICATIONS HAVE A |
| | REFERENCE TO ICBO. THE VP (METAL |
| | BUILDING) DECLARE SBC 110 MPH. |
| | |
| | SEE SBC 1606.1.2. |