2002-08-01 00:00:00STORM PANEL SUBMITTAL DENIED
  
 1) THE MEANS OF EGRESS FROM THE UNITS
 MUST BE MAINTAINED. THE STORM PANEL
 INSTALLATION SCHEDULE INDICATES THAT
 THE FRONT DOOR AND SIDELITE ARE BEING
 SHUTTERED. THE ONLY EXIT FROM THE
 STRUCTURE WOULD BE THROUGH THE GARAGE
 AND OUT THROUGH THE OVERHEAD DOOR. THE
 BUILDING OFFICIAL WILL NOT ALLOW THIS.
 THEIR ARE SEVERAL OPTIONS. THE FRONT
 DOOR CAN BE IMPACT RATED METAL OR WOOD
 AND THE SIDELITE CAN BE SHUTTERED. THE
 FRONT DOOR ASSEMBLY CAN BE IMPACT
 RESISTANT GLAZING. THE PANELS CAN BE
 MOUNTED TO A WOOD DOOR WITH BUSHINGS SO
 THAT THE GLAZING IS PROTECTED. THERE MAY
 BE OTHER ACCEPTABLE OPTIONS. APPROPRIATE
 PRODUCT APPROVALS WILL BE REQUIRED FOR
 THE SELECTED OPTION. PLEASE INDICATE
 HOW COMPLIANCE WILL BE MET.
  
 2) PLEASE SUBMIT YOUR STORM PANEL
 INSTALLATION PLAN FOR THE BUILDING
 OFFICIALS REVIEW. THE FOLLOWING ITEMS
 MUST BE ADDRESSED.
 A) WHO WILL INSTALL (BUILDING STAFF)
 B) TIME TO INSTALL
 C) STORED ON SITE, INDICATE ON PLANS
 (IF STORED STANDING, AN ENGINEER IS TO
 DESIGN THE ENCLOSURE)
 D) THE BUILDING OFFICIAL MUST APPROVE
 THE WRITTEN PLAN
 E) ALLOWED ONLY ON GROUND FLOOR
  
 INDICATE ON THE PLAN THAT YOU ARE
 INSTALLING IMPACT RESISTANT GLAZING ON