| Date |
Text |
| 2002-08-01 00:00:00 | STORM PANEL SUBMITTAL DENIED |
| | |
| | 1) THE MEANS OF EGRESS FROM THE UNITS |
| | MUST BE MAINTAINED. THE STORM PANEL |
| | INSTALLATION SCHEDULE INDICATES THAT |
| | THE FRONT DOOR AND SIDELITE ARE BEING |
| | SHUTTERED. THE ONLY EXIT FROM THE |
| | STRUCTURE WOULD BE THROUGH THE GARAGE |
| | AND OUT THROUGH THE OVERHEAD DOOR. THE |
| | BUILDING OFFICIAL WILL NOT ALLOW THIS. |
| | THEIR ARE SEVERAL OPTIONS. THE FRONT |
| | DOOR CAN BE IMPACT RATED METAL OR WOOD |
| | AND THE SIDELITE CAN BE SHUTTERED. THE |
| | FRONT DOOR ASSEMBLY CAN BE IMPACT |
| | RESISTANT GLAZING. THE PANELS CAN BE |
| | MOUNTED TO A WOOD DOOR WITH BUSHINGS SO |
| | THAT THE GLAZING IS PROTECTED. THERE MAY |
| | BE OTHER ACCEPTABLE OPTIONS. APPROPRIATE |
| | PRODUCT APPROVALS WILL BE REQUIRED FOR |
| | THE SELECTED OPTION. PLEASE INDICATE |
| | HOW COMPLIANCE WILL BE MET. |
| | |
| | 2) PLEASE SUBMIT YOUR STORM PANEL |
| | INSTALLATION PLAN FOR THE BUILDING |
| | OFFICIALS REVIEW. THE FOLLOWING ITEMS |
| | MUST BE ADDRESSED. |
| | A) WHO WILL INSTALL (BUILDING STAFF) |
| | B) TIME TO INSTALL |
| | C) STORED ON SITE, INDICATE ON PLANS |
| | (IF STORED STANDING, AN ENGINEER IS TO |
| | DESIGN THE ENCLOSURE) |
| | D) THE BUILDING OFFICIAL MUST APPROVE |
| | THE WRITTEN PLAN |
| | E) ALLOWED ONLY ON GROUND FLOOR |
| | |
| | INDICATE ON THE PLAN THAT YOU ARE |
| | INSTALLING IMPACT RESISTANT GLAZING ON |
| | THE SECOND FLOOR. |