| Plan Review Notes For Permit 01121248 |
| Permit Number |
01121248 |
|
| Review Stop |
R |
| Sequence Number |
5 |
|
| Notes |
| Date |
Text |
| 2002-05-28 00:00:00 | TRUSS DRAWINGS AND SUBMITTAL PACKAGE | | | CHECKLIST: | | | | | | 1-TRUSS DRAWINGS ARE MISSING THE | | | ENGINEERED FLOOR TRUSSES. THEY ARE NOT | | | EVEN IN THE INDEX SHEET. | | | 2-TRUSS ENGINEER FAILURE TO PROVIDE ALL | | | HIS INFORMATION ON THE TRUSS LAYOUT | | | AS REQUIRED BY CHAPTER 471 FLORIDA | | | STATUTES AND AS REQUESTED ON PREVIOUS | | | CHECKLIST. | | | 3-BUTT GLAZING ASSEMBLY TO BE DESIGNED | | | AS REQUIRED BY SECTION 2406.2 FBC | | | 2001. READ THAT SECTION AND SUBMIT | | | APPROPRIATE PACKAGE. | | | 4-SLIDING GLASS DOORS PRODUCT APPROVAL | | | IS NOT GOOD. SEE SIZE AND DESIGN | | | PRESSURES SPECIFIED ON ARCHITECT'S | | | PLANS. | | | 5-PROVIDE PRODUCT APPROVAL FOR POCKET | | | SLIDING GLASS DOORS ASSEMBLY. SEE | | | ARCHITECT'S PLANS FOR SIZE AND DESIGN | | | PRESSURES. | | | 6-PROVIDE FRAMING DETAILS AND SPECS FOR | | | POCKET SLIDING GLASS DOORS. | | | | | | | | | NOTES: | | | | | | 1-STAMPED DRAWINGS AND PRODUCT APPROVALS | | | ARE ALREADY APPROVED. | | | 2-COORDINATE WITH BUILDING INSPECTOR | | | REGARDING THE TRUSS DRAWINGS PACKAGE. |
|