| Date |
Text |
| 2002-01-16 00:00:00 | CHECKLIST: |
| | 1-NEED TO RECORD NOTICE OF COMMENCEMENT. |
| | 2-PROVIDE EGRESS FROM LOFT AREA AS REQ'D |
| | BY SECTION 1005.4 SBC 1997. |
| | 3-PROVIDE ATTIC ACCESS AT FRONT AREA OF |
| | FIRST FLOOR ROOF. SEC. 2309.6 SBC 1997 |
| | AND SPECIFY SIZE OF ATTIC ACCESS |
| | LEADING TO FAMILY AREA ROOF. |
| | 4-SPECIFY ONE HOUR FIRE RATED WALL FOR |
| | ZERO LOT LINE WOOD FRAMED WALL. AS |
| | REQUIRED BY TABLE 600 SBC 1997. |
| | NOTE: 1 HR FIRE RATED BASED ON EXTERIOR |
| | AND INTERIOR FIRE EXPOSURE. SEE NOTE |
| | I ON TABLE 600 SBC 1997. |
| | 5-PROVIDE 29" MINIMUM CLEAR OPENING AT |
| | MASTER BATHROOM. SEE ENTRANCE TO WATER |
| | CLOSET RM. CHAPTER 11 OF FLORIDA |
| | ACCESSIBILITY CODE, 1997 ED. |
| | 6-SPECIFY DRAFSTOPPING MATERIAL AND |
| | LOCATION ON 2ND FLOOR FRAMING PLAN. |
| | SEC. 2305.2.2 SBC 1997. |
| | 7-PROVIDE COMPLETE SECTION/DETAIL FROM |
| | FOOTING TO ROOF AT INTERIOR FRAMED |
| | BEARING WALL. SPECIFY ALL FASTENERS. |
| | SEC. 104.2.2 CITY AMENDMENTS TO SBC/97 |
| | 8-2 STORY BEARING WALL ON SHEET 5.2 |
| | DOESN'T MATCH FRAMING PLANS. REVISE. |
| | 9-PROVIDE DETAILS AND COMPLETE SPECS FOR |
| | CEILING INSTALLATION AT ENTRY AND REAR |
| | PORCHES. SEE ASTM C926 AND ASTM C1063. |
| | 10-REVISE TREAD/RISER RATIO ON STAIRS |
| | SECTION. SEC. 1007.3 SBC 1997. |
| | 11-PROVIDE SMOKE DETECTOR AT FIRST FLOOR |
| | ALSO AS REQ'D BY SEC. 905.2.2 SBC 1997 |
| | 12-PROVIDE PRODUCT APPROVAL FOR: |
| | A)SINGLE HUNG WINDOWS (EXPIRED). |
| | B)ARCHED WINDOW (EXPIRED). |
| | C)1 HR GLASS BLOCK ASSEMBLY INFORMATION |
| | IS TOO OLD. PROVIDE CURRENT 1 HR FIRE |
| | RATED UL ASSEMBLY AND/OR ONE HOUR FIRE |
| | RATED GLASS BLOCK PRODUCT APPROVAL. |
| | D)ENTRY DOORS (EXPIRED). |
| | |
| | 13-CONNECTORS SPECIFIED FOR TRUSS WD7 |
| | DON'T RESIST THE UPLIFT LOADS THAT |
| | WERE CALCULATED ON ENGINEERED TRUSSES. |
| | REVISE AS REQUIRED. |
| | -SPECIFY CONNECTORS FOR TRUSSES FGE4 & |
| | FGE7. SEE ENGINEERED TRUSSES. |
| | 14-UPDATE/REVISE ALL GENERAL TRUSS DWGS |
| | AS REQUIRED. SEE COMMENTS. |
| | 15-ENGINEER OF RECORD WHO REVIEW ALL THE |
| | TRUSS DWGS TO CLEARLY INDICATE THE |
| | NAME OF FIRM WHO REVIEWED THE DWGS. |
| | USE STANDARD REVIEW STAMP, IF POSSIBLE |
| | 16-SEE PLANS FOR ADDITIONAL COMMENTS AND |
| | BRING BACK REVIEWED SET IN ORDER TO |
| | EXPEDITE THE REVIEW PROCESS. |