| 2002-01-09 00:00:00 | CHECKLIST: |
| | 1-NEED TO RECORD NOTICE OF COMMENCEMENT. |
| | 2-AFTER ORIGINAL DRAWINGS ARE REVISED, |
| | BRING THEM TO PALM BEACH COUNTY TO PAY |
| | IMPACT FEES. BRING PAID RECEIPT AND |
| | STAMPED DRAWINGS. |
| | 3-PROFESSIONAL ENGINEER OF RECORD TO |
| | HAVE ALL HIS INFORMATION ON ALL DWGS |
| | AS REQ'D BY CHAPTER 471 FL. STATUTES. |
| | -ENG'R TO DATE DWGS AT TIME OF SEALING. |
| | 4-PROVIDE AREA CALCULATIONS FOR A/C AND |
| | NON A/C AREAS TO DETERMINE RADON FEES |
| | AND VALUATION. |
| | 5-SPECIFY SAFETY GLASS WHERE REQUIRED. |
| | SEE PLANS AND SEC. 2405.2 SBC 1997. |
| | 6-SPECIFY MINIMUM BEARING SIZE REQUIRED |
| | AT THE ENDS OF LINTELS. |
| | -SEE OPENING SIZES & LINTELS SPECIFIED. |
| | REVISE AS REQUIRED. |
| | 7-PROVIDE COMPLETE SECTION/DETAILS AND |
| | SPECS FOR CONNECTION OF LINTEL TO |
| | CONCRETE BLOCK COLUMNS AT REAR PORCH. |
| | SEC. 104.2.2 CITY AMENDMENTS TO SBC/97 |
| | 8-PROVIDE COMPLETE DETAILS/SPECS FOR |
| | CONNECTION OF 2X WOOD BEAM TO CONCRETE |
| | COLUMNS & TO TIE BEAM AT ENTRY PORCH. |
| | NOTE: ENTRY SECTION IN PAGE 6 OF 6 IS |
| | MISSING SOME INFORMATION. SEE COMMENTS |
| | 9-SPECIFY CEILING CONSTRUCTION AT ENTRY |
| | AND REAR PORCH. SPECIFY ALL MATERIALS |
| | AND FASTENERS AS REQUIRED BY ASTM |
| | C1063 AND ASTM C926. SEE SECTION |
| | 2504.2 SBC 1997. |
| | 10-SPECIFY ROOF SHEATHING FASTENINGS |
| | TYPE AND SPACING. SEE TABLE 2306.1OF |
| | CITY AMENDMENTS TO SBC 1997. |
| | 11-SPECIFY SIZE OF SCREEN VENTS THAT |
| | COMPLY WITH SEC. 2309.7 SBC 1997. |
| | 12-COMPLETE INFORMATION ON TOP OF DESIGN |
| | CERTIFICATION FOR BUILDING CODE COM- |
| | PLIANCE FORM. ALSO, USE LEGIBLE FORM. |
| | 13-SPECIFY THE DESIGN PRESSURES THAT |
| | WERE CALCULATED AT EACH EXTERIOR OPN'G |
| | FOR COMPONENTS AND CLADDING. SEE SEC. |
| | 1606 SBC 1997. |
| | 14-PROVIDE PRODUCT APPROVAL FOR: |
| | A)ENTRY DOORS WITH TRANSOM ABOVE SINGLE |
| | ASSEMBLY AS SHOWN ON PLANS. |
| | B)SINGLE HUNG WINDOWS PRODUCT APPROVAL |
| | EXPIRED AND NEED APPROVED DRAWINGS. |
| | C)SLIDING GLASS DOORS NEED THE APPROVED |
| | DRAWINGS. |
| | |
| | 15-REVISE ENERGY CALCULATIONS: |
| | A)USE FORM 600 A-97. |
| | B)FILL TOP OF FORM. |
| | C)OWNER OR AGENT TO SIGN AND DATE THE |
| | BOTTOM OF FORM. |
| | |
| | 16-PROVIDE PRODUCT APPROVAL AND COMPLETE |
| | INFORMATION FOR STORM SHUTTERS AS |
| | REQUIRED. SEE PROCEDURE AND SAMPLE FOR |
| | STORM SHUTTERS ATTACHED. |
| | NOTE: IF INFORMATION IS INCOMPLETE, |
| | THEN CONTRACTOR MAY APPLY FOR SEPARATE |
| | PERMIT. |
| | 17-SEE PLANS FOR ADDITIONAL COMMENTS. |
| | INCLUDING COMMENTS BY OTHER TRADES. |
| | PLEASE, RETURN REVIEWED SET AFTER |
| | CORRECTIONS ARE DONE TO ORIGINAL DWGS |
| | IN ORDER TO EXPEDITE THE REVIEW. |