| Date |
Text |
| 2001-12-19 00:00:00 | BUILDING PLAN REVIEW |
| | *******DENIED******* |
| | ROBERT BROWN(561) 659 8096 EXT 8499 |
| | |
| | SBC = STANDARD BUILDING CODE |
| | SBC*= STANDARD BUILD'G CODE (AMENDMENTS) |
| | FL ACC CODE = FLORIDA ACCESSIBILITY CODE |
| | |
| | THE FOLLOWING COMMENTS ARE NUMBERED AS |
| | PER THE 12/4/01 BUILDING PLAN REVIEW. |
| | |
| | 1) PROVISO. SBC* 104.1.1A SEPARATE |
| | ROOFING PERMIT APPLICATION IS REQUIRED. |
| | NOTE THAT A PRODUCT APPROVAL WILL BE |
| | REQUIRED FOR THE FIBERGLASS SHINGLES. |
| | |
| | 3) PROVISO. FL ACC CODE 4.23.2AS |
| | PREVIOUSLY STATED THE BATHROOM DOOR |
| | SHALL HAVE A MINIMUM CLEAR OPENING OF |
| | 29 INCHES. ADD DIMENSION TO PLAN. |
| | |
| | 4) SBC* 1707.4 AND 2405.1.1THE PRODUCT |
| | APPROVAL FOR THE EXTERNAL DOOR REQUIRES |
| | THE USE OF IMPACT RESISTANT SHUTTERS. |
| | THE PRODUCT APPROVAL FOR THE WINDOWS IS |
| | MISSING SHEET 2 WHICH WILL BE ENTITLED |
| | 'NOTICE OF ACCEPTANCE: SPECIFIC |
| | CONDITIONS' AND WILL STATE WHETHER |
| | IMPACT SHUTTERS ARE REQUIRED.EITHER |
| | PROVIDE IMPACT SHUTTERS OR DEMONSTRATE |
| | THAT THEY ARE NOT REQUIRED BY THE |
| | PRODUCT APPROVAL. |
| | |
| | 5) SBC 2405.2.1(1),(2)&(4)THE GLAZING |
| | IN THE BATHROOM WINDOW, NEW EXTERNAL |
| | DOOR AND REPLACEMENT FRONT WINDOWS IS |
| | IN HAZARDOUS LOCATIONS AND SHALL PASS |
| | THE IMPACT AND OTHER REQUIREMENTS OF |
| | CPSC 16-CFR, PART 1201, AS PREVIOUSLY |
| | STATED. |