| 2002-04-02 00:00:00 | BEFORE A PERMIT TO CONSTRUCT MAY BE |
| | ISSUED, IMPACT FEES MUST BE PAID TO THE |
| | COUNTY FOR THE CITY.THEPERMIT PLANS |
| | MUST BE STAMPED BY THAT OFFICE AND A |
| | COPY OF THE PAID RECEIPT ATTACHED TO |
| | THE PERMIT APPLICATION.CALL |
| | 561-233-5025 FOR MORE INFORMATION. |
| | |
| | PLEASE PROVIDE A RECENT SIGNED AND |
| | SEALED PROPERTY SURVEY. |
| | |
| | PROVIDE DOCUMENTATION THAT THE |
| | FOUNDATION REQUIREMENTS OF SBC 1803.2 |
| | HAVE BEEN ADDRESSED. |
| | |
| | EGRESS FROM THE EXISTING BUILDING IS NOT |
| | PERMITTED THROUGH THE GARAGE.SEE SBC |
| | 1001.1.3. |
| | |
| | EGRESS FROM THE GARAGE MUST COMPLY WITH |
| | SBC 1012.1.2 AND 1027.3. THE ELECTRIC |
| | SLIDING GATES DO NOT MEET EXIT DOOR |
| | REQUIREMENTS. |
| | |
| | THE 6" STEP SHOWN AT THE STAIR DOORS IS |
| | PROHIBITED BY SBC 1012.1.3. |
| | |
| | SHEET A2 SHOWS WINDOWS IN THE EXISTING |
| | BUILDING OPENING INTO THE PROPOSED |
| | GARAGE.THIS IS PROHIBITED BY SBC |
| | 411.2.6. |
| | |
| | SBC F102.2.5 REQUIRES TWO STORY |
| | BUILDINGS TO BE ONE HOUR PROTECTED. |
| | PROVIDE THE FIRE DESIGN NUMBER FOR THE |
| | BAR JOIST ROOF SYSTEMS, SEE SBC 701.5.2. |
| | |
| | SEE ALSO SBC F102.2.6 REGARDING TWO HOUR |
| | EXTERIOR WALL RATINGS. |
| | |
| | GIVEN THAT HURRICANE MISSILE IMPACT |
| | RESISTANCE IS REQUIRED FOR THE SECOND |
| | FLOOR GLAZING, INDICATE HOW FIRE |
| | DEPARTMENT ACCESS IN ACCORDANCE WITH |
| | SBC 1405.1 WILL BE ACCOMPLISHED.SEE |
| | ALSO SBC 903.5 #2. |
| | |
| | SHEETS S3 AND S4 INDICATE VARYING ROOF |
| | HEIGHTS AND BASE VELOCITY PRESSURES, |
| | AND SHEET S8 CITES ASCE 7-93 AS THE |
| | DESIGN STANDARD.SBC 1606.1.2 |
| | PROHIBITS THE MIXING OF WIND LOADS AND |
| | NOTE #1 TO SBC TABLE 1606.2A REQUIRES A |
| | SINGLE VELOCITY PRESSURE VALUE FOR THE |
| | WHOLE BUILDING.PLEASE REVISE AS |
| | NECESSARY AND ENSURE COMPLIANCE WITH |
| | SAME. |
| | |
| | PLEASE PROVIDE A PRESSURE ZONE SKETCH OR |
| | TABLE FOR THE WALLS AS WELL AS THE |
| | ROOFTO BE USED FOR THE COMPONENTS AND |
| | CLADDING. |
| | |
| | PLEASE PROVIDE A COPY OF THE SOIL |
| | ENGINEER'S REPORT. |
| | |
| | PROVIDE TEST REPORTS AND OR NOTICE OF |
| | ACCEPTANCE REPORTS FOR THE WINDOWS, |
| | DOORS AND ROOF COVERING. |
| | |
| | PROVIDE THE TEST DATA FOR THE HURRICANE |
| | MISSILE IMPACT RESISTANCE OF THE GLAZED |
| | AREAS IN THE EXTERIOR BUILDING ENVELOPE, |
| | INCLUDING THE EXISTING BUILDING |
| | PORTIONS.SEE THE ATTACHED |
| | INTERPRETATION STATEMENT. |
| | |
| | IS THE BRICK FINISH SHOWN ON SHEET A7 |
| | PROPOSED TO BE REAL OR SIMULATED.IF |
| | REAL PROVIDE DETAILS OF CONSTRUCTION |
| | DEMONSTRATING COMPLIANCE WITH SBC |
| | 1403.2. |
| | |
| | PROVIDE DETAILS FOR THE GUARD RAIL SHOWN |
| | IN ELEVATION A8.02 AND THE STAIR |
| | HANDRAILS, INCLUDING DESIGN LOADS. SEE |
| | SBC 1007.51015 AND 1608.2. |