| Date |
Text |
| 2001-11-21 00:00:00 | CHECKLIST: |
| | 1-PROVIDE SOIL TEST REPORT. THIS IS THE |
| | INFORMATION THAT ENGINEER'S USE FOR |
| | DESIGNING THE FOUNDATION. |
| | 2-SPECIFY SIZE OF WINDOWS REPLACED AT |
| | BEDROOMS IN ORDER TO VERIFY MINIMUM |
| | OPENING CLEARANCES FOR EGRESS AS REQ'D |
| | BY SECTION 1005.4 SBC 1997. |
| | 3-PROVIDE ATTIC ACCESS AS REQUIRED BY |
| | SECTION 2309.6 SBC 1997. |
| | 4-PROVIDE ENERGY CALCULATIONS FOR THE |
| | ADDITION AND FOR THE RENOVATION AS |
| | REQUIRED BY THE FLORIDA ENERGY |
| | EFFICIENCY CODE FOR BUILDING, 1997 ED. |
| | 5-PROVIDE STRUCTURAL BUCK DETAILS FOR |
| | DOORS AND WINDOWS. SECTION 104.2.2 OF |
| | CITY AMENDMENTS TO SBC 1997. |
| | 6-PROVIDE COMPLETE CONSTRUCTION DETAIL |
| | FOR INSTALLATION OF FRENCH DOORS TO |
| | STEEL TUBE BY MASTER BEDROOM. SPECIFY |
| | ALL FASTENERS. |
| | NOTE: SEE DOORS' PRODUCT APPROVAL |
| | DRAWINGS TO ASSURE THAT INSTALLATION |
| | WILL MEET THE PRODUCT APPROVAL SPECS. |
| | 7-SPECIFY FIREBLOCKING WHERE REQUIRED. |
| | SEE DWGS AND SECTION 2305 SBC 1997. |
| | 8-SPECIFY ATTIC VENTILATION AS REQUIRED |
| | BY SECTION 2309.7 SBC 1997. |
| | 9-PROVIDE 2 PRODUCT APPROVALS FOR: |
| | A)ROOF SHINGLES. B)FRENCH DOORS-IMPACT |
| | C)SLIDING GLASS DOORS-IMPACT. D)SINGLE |
| | HUNG WINDOWS-IMPACT. E)CASEMENT WIND. |
| | -IMPACT. F)FIXED WINDOWS-IMPACT. NOTE: |
| | SEE SIZES SHOWN ON ARCHITECTURAL PLANS |
| | G)WINDOW MULLIONS-IMPACT. H)AWNING |
| | WINDOWS-IMPACT. I)ENTRY DOORS-IMPACT. |
| | 10-SEE COMMENTS ON PLANS, INCLUDING THE |
| | OTHER TRADES AND RETURN REVIEWED SET |
| | AFTER ALL CORRECTIONS ARE DONE TO THE |
| | ORIGINAL DRAWINGS IN ORDER TO EXPEDITE |
| | THE REVIEW PROCESS. |