| Plan Review Notes For Permit 01091471 |
| Permit Number |
01091471 |
|
| Review Stop |
M |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2002-04-01 00:00:00 | | | | PLEASE CLARIFY THE SEQUENCE OF OPERATION | | | FOR THE CORRIDOR (PLAN SHEET M-16).AS | | | PER NFPA 92A 1.5.2, THE PRIMARY MEANS | | | OF CONTROLLING SMOKE MOVEMENT IS BY | | | CREATING AIR PRESSURE DIFFERENCES | | | ACROSS PARTIONS, FLOORS AND OTHER | | | BUILDING COMPONENTS.THE BASIC CONCEPT | | | OF BUILDING PRESSURIZATION IS TO | | | ESTABLISH A HIGHER PRESSURE IN ADJACENT | | | SPACES THAN IN THE SMOKE ZONE.THE | | | SEQUENCE OF OPERATION AS DESCRIBED ON | | | PLAN SHEET M-15, INDICATES THE OPPOSITE | | | OF WHAT IS REQUIRED BY NFPA 92A.SMOKE | | | ZONE IS POSITIVE AND OTHER FLOORS ARE | | | NEGATIVE. | | | | | | CONTACT CHIEF MECHANICAL INSPECTOR | | | (NANCY DENMARK), FOR MEETING ON THE | | | TEST CRITERIA FOR SMOKE CONTROL SYSTEM. | | | | | | PLEASE NOTE DRYERS TO BE INSTALLED AT | | | FINAL INSPECTION. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT 659-8096 | | | EXT. 8388. | | | | | | SPOKE WITH RALPH PENA (ENG) - SHOW | | | COMPLIANCE WITH 1997 SBC 412.5. |
|