| Date |
Text |
| 2001-10-23 00:00:00 | CHECKLIST: |
| | 1-AFTER ORIGINAL DRAWINGS ARE REVISED |
| | PAY IMPACT FEES AND BRING RECEIPT AND |
| | STAMPED DRAWINGS. |
| | 2-NEED TO RECORD NOTICE OF COMMENCEMENT. |
| | 3-PROVIDE SURVEY THAT MATCHES FLOOR PLAN |
| | 4-ARCHITECT TO COMPLETELY FILL OUT THE |
| | DESIGN CERTIFICATION FOR BUILDING CODE |
| | COMPLIANCE FORM. SEE ATTACHED. |
| | 5-ARCHITECT TO SPECIFY THE DESIGN |
| | PRESSURES CALCULATED AT ALL EXTERIOR |
| | OPENINGS. SEC 1606 SBC 1997. |
| | 6-PROVIDE ENERGY CALCULATIONS REQUIRED |
| | BY THE FLORIDA ENERGY EFFICIENCY CODE |
| | FOR BUILDING CONSTRUCTION, 1997 ED. |
| | 7-SPECIFY SAFETY GLASS AS REQUIRED BY |
| | SEC. 2405.2 SBC 1997. |
| | 8-PROVIDE CURRENT PRODUCT APPROVAL AND |
| | COMPLETE INFORMATION FOR STORM PANELS |
| | OR APPLY FOR A SEPARATE PERMIT. |
| | -NEED KEY PLAN, COMPLETE INSTALLATION |
| | SCHEDULE AND CLEARLY INDICATE ON |
| | APPROVED STORM PANEL DRAWINGS THE |
| | SPECIFIC MOUNTING CONDITIONS & ANCHORS |
| | TO BE USED ACCORDING TO APPROPRIATE |
| | CONDITIONS. |
| | 9-CLEARLY INDICATE ON PLANS TYPE & SIZES |
| | OF WINDOWS IN ORDER TO VERIFY COMPLIAN |
| | -CE WITH THE EGRESS REQUIREMENTS OF |
| | SEC. 1005.4 SBC 1997. |
| | ALSO, IDENTIFY ALL ROOMS IN FLOOR PLAN |
| | 10-PROVIDE PRODUCT APPROVAL FOR: |
| | A)ROOF TILE. |
| | B)WINDOW MULLIONS. |
| | C)FRENCH DOORS. |
| | D)ENTRY DOOR WITH SIDELITES SINGLE |
| | ASSEMBLY AS SHOWN ON EXT. ELEVATIONS. |
| | E)GARAGE DOORS (NEED DESIGN PRESSURES |
| | CALCULATED BY THE ARCHITECT TO VERIFY |
| | ADEQUACY FOR THIS BUILDING) |
| | |
| | 11-SPECIFY ATTIC VENTILATION AS REQUIRED |
| | BY SEC. 2309.6 SBC |
| | 12-SPECIFY CONNECTORS, FOOTING SIZE, ETC |
| | SEE COMMENTS ON 3 OF 5. |
| | 13-OWES $86.35 FOR UPDATED VALUATION AND |
| | RADON FEES. |
| | |
| | |
| | |
| | NOTE: |
| | -PLEASE RETURN REVIEWED SET AFTER ALL |
| | CORRECTIONS ARE DONE TO THE ORIGINAL |
| | DRAWINGS IN ORDER TO EXPEDITE THE |
| | REVIEW PROCESS. |