| Date |
Text |
| 2001-10-10 00:00:00 | 1) SOME FIRE SPRINKLER HEADS NOTED ON |
| | THE PLANS MAY BE INCLUDED IN THE |
| | VOLUNTARY RECALL BY CENTRAL FIRE |
| | SPRINKLER COMPANY. PLEASE SEE |
| | ATTACHED INFORMATION PROVIDED WITH |
| | PLANS. VERIFICATION IS NEEDED THAT |
| | FIRE SPRINKLER HEADS PLANNED FOR USE |
| | ARE NOT PART OF THIS RECALL PLAN. |
| | PLEASE PROVIDE CUT SHEETS ON FIRE |
| | SPRINKLER HEADS, PRESSURE REDUCING |
| | VALVES, PIPE AND OTHER APPURTENANCES |
| | PLANNED FOR USE. |
| | 2) PLEASE NOTE ON THE PLANS THAT |
| | PRESSURE TESTS FOR A DURATION OF TWO |
| | HOURS WILL BE CONDUCTED WITH THE CITY |
| | FIRE RESCUE DEPARTMENT. |
| | 3) WET FIRE HYDRANTS ARE REQUIRED PRIOR |
| | TO,DURING AND AFTER CONSTRUCTION. |
| | 4) PLEASE INDICATE WHERE THE SPARE |
| | HEAD BOX AND WRENCH WILL BE LOCATED. |
| | 5) PLEASE INDICATE ON THE PLANS THAT |
| | TEMPORARY STANDPIPES WITH FIRE |
| | DEPARTMENT CONNECTIONS WILL BE PROVIDED |
| | WHEN THE BUILDING REACHES THREE STORIES |
| | AND FIFTY FEET IN HEIGHT. |
| | 6) MORE DETAILS NEEDED ON PRESSURE |
| | REDUCING VALVES. |
| | 7) ALL VALVES ARE TO BE PROPERLY TAGGED. |
| | PLEASE NOTE THIS ON THE PLANS. |
| | 8) VALUE APPEARS TO BE LOW FOR THE |
| | SCOPE OF WORK. PLEASE PROVIDE A COPY |
| | OF THE CONTRACT. |
| | 9) NO HANGERS SHOWN ON THE DRAWINGS. |
| | 10) STANDPIPE SYSTEM TO COMPLY WITH |
| | NFPA 14. THE STANDPIPE SYSTEM TO BE |
| | PROVIDE AT LEAST 65 PSI AT THE ROOF |
| | WHEN FLOWING WATER. |
| | 11) ENTIRE BUILDING IS REQUIRED TO BE |
| | FIRE SPRINKLER PROTECTED EXCEPT FOR |
| | RECOGNIZED EXCEPTIONS TO THE CODE. |
| | ANY SOFFITS INSTALLED ARE NOT TO |
| | OBSTRUCT FIRE SPRINKLER DISCHARGE |
| | PATTERNS. |
| | |
| | MIKE CARSILLO, CAPTAIN |
| | 659-8096,EXT.8497 |
| | 835-2910 |