| 2002-03-06 00:00:00 | *************TRUSSES DENIED************* |
| | |
| | 1) THE TRUSS DRAWINGS ARE REQUIRED TO |
| | HAVE THE EMBOSSED SEAL OF THE TRUSS |
| | ENGINEER. |
| | |
| | 2) PLEASE CORRECT WINDLOAD LISTED ON THE |
| | TRUSS LAYOUT TO THE SAME AS THAT LISTED |
| | ON THE TRUSS DRAWINGS. |
| | |
| | 3) THE DESIGNER OF RECORD FOR THE |
| | STRUCTURE IS REQUIRED TO STAMP, SIGN AND |
| | DATE THE TRUSS LAYOUT. THE STAMP SHOULD |
| | STATE THAT THE LAYOUT AND DRAWINGS HAVE |
| | BEEN REVIEWED AND APPROVED BY HIM. |
| | THIS IS IN ADDITION TO THE LETTER FROM |
| | DESIGNER OF RECORD. |
| | |
| | 4)THE UPLIFT GIVEN ON THE TRUSS DRAWINGS |
| | EXCEEDS THE CAPACITIES OF THE CONNECTORS |
| | SPECIFIED IN THE SCHEDULE ON SHEET 6 OF |
| | THE PLANS FOR SEVERAL OF THE TRUSSES. |
| | T-21 @ 15= 1869# > A2 = 1060# |
| | T-7 @ 2= 3339# > A5 = 2650# |
| | T-8 @ 2= 2167# > A3 = 1300# |
| | T-9 @ 2= 2234# > A3 = 1300# |
| | T-3 @ 2&6= 1516# > A1 =755# |
| | T-32,T-33,T-26,T-27,T-28,ETC. |
| | PLEASE REVIEW TRUSS DRAWINGS AND |
| | CONNECTOR SCHEDULE AND MAKE CORRECTIONS |
| | AS NECESSARY. |
| | |
| | AN ADDITIONAL RESUB FEE WILL BE ASSESSED |
| | FOR SUBSEQUENT RESUBS. THERE WAS NO |
| | CHARGE FOR THE FIRST RESUB. SEE ATTACH- |
| | MENT. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CALL: |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)659-8096 EXT.8202 |