| 2001-08-28 00:00:00 | *************** UNSAT ************** |
| | |
| | 1)NOTE: PLEASE NOTE THAT PANEL SCHEDULE |
| | IS SHOWING ALL 2-POLE BRKRS ON LEFT AND |
| | RIGHT OF PANEL ON THE SAME PHASE. PLEASE |
| | CORRECT. ALL 2POLE BRKRS SHOULD LINE UP |
| | ON SAME SIZE FOR 220V |
| | |
| | 2)NOTE: PLEASE NOTE LOAD FOR WATER HEAT- |
| | -ER NEEDS TO CORRELATE W/ LOAD SHOWN ON |
| | PANEL SCHEDULE. |
| | |
| | 3)NOTE: PLEASE NOTE THAT RISER DIAGRAM |
| | IS MISSING RISER SIZE, WIRE SIZE FROM |
| | RISER TO METER TO MAIN DISCONNECT. |
| | |
| | 4)NOTE: PLEASE ALSO NOTE THAT PLANS SHOW |
| | MAIN DISCONNECT AND A MCB PANEL. PLEASE |
| | NOTE PANEL MAY HAVE MAIN ALSO BUT IS NOT |
| | REQUIRED W/ MAIN DISCONNECT OUTSIDE. |
| | |
| | 5)NOTE: PLEASE NOTE ALL CONTINOUS LOADS |
| | TO BE SHOWN AT 125%. (LIGHTING) ETC. |
| | PER 230-42/215-3 |
| | |
| | 6)NOTE: PLEASE NOTE LOAD SHOWN FOR WATER |
| | HEATER AT 1500 WATTS AND 20KW ?? WHICH |
| | ONE? PLEASE ALSO NOTE THAT IF 1500WATTS |
| | THEM THE MAX OCP IS AT 150%. YOU SHOW |
| | A 2-P-30. PLEASE CORRECT |
| | |
| | 7) NOTE: PLEASE SHOW GROUNDING ELECTRODE |
| | GOING TO BUILDING STEEL AND COLD WATER |
| | PER 250-50. SHOWS CWP, NOT BLDG STEEL. |
| | |
| | 8)NOTE: PLEASE NOTE THAT PLANS NEED TO |
| | SHOW ALL BRANCH CIRCUIT #`S ON PLANS |
| | AND CORRELATE WITH SUBMITTED PANEL |
| | SCHEDULES.215-5 |
| | |
| | 9)NOTE: PLEASE SUBMIT AIC RATINGS FOR |
| | ALL NEW EQUIPMENT BEING INSTALLED. |
| | MAINS/PANELS/BREAKERS MUST BE RATED FOR |
| | THE AVAILABLE FAULT CURRENT PER 110-9. |
| | PLEASE NOTE THAT AIC RATING IS SHOWN FOR |
| | PANEL, BUT NOT FOR MAIN. PLEASE SUBMIT |
| | |
| | |