Plan Review Notes
Plan Review Notes For Permit 01071485
Permit Number 01071485
Review Stop P
Sequence Number 2
Notes
Date Text
2001-10-15 00:00:00DENIED
 REFERENCE: SPC-94 - SGC-97 - FACBC-97
  
 1) GREASE TRAP, TYPE AND SIZE. CONTACT
 WPB RSTP, ENVIRONMENTAL COMPLIANCE. R
 COMPO (561) 837-4074 ORD #2938-96.
 PLEASE PROVIDE SEATING CAPACITY, BALL-
 ROOM HOLDS 3904. RESPONSE NOTED, BUT NOT
 ADDRESSED FROM PREVIOUS REVIEW.
 2) SHTA1-7.1 - 7.2, PROVIDE CALCULATIONS
 FOR PRIMARY AND SECONDARY STORM DRAINS.
 SEC 1108 AND 1109 + 1/2 THE AREA OF THE
 VERTICAL WALLS, UPPER ROOFS DRAINING TO
 LOWER ROOFS TO BE INCLUDED. CALCULATIONS
 ARE REQUIRED TO CHECK PIPE SIZES.
 3) SHT P1-1.1 AHU CONDENSATE DRAIN DE-
 TAIL, COMPLY W/SEC 104.2 & 104.3 PLANS &
 SPECS., PROVIDE AN ISOMETRIC DRAWING OF
 A COMMON A/C CONDENSATE SYSTEM, CONNECT-
 ED TO STORM DRAINAGE SYSTEM OUTSIDE OF
 BUILDING WITH A OVERFLOW VENT 6" ABOVE
 GRADE AS REQUESTED IN PREVIOUS REVIEW.
 4) SHT P2-1.1 CONDENSATE TIED INTO STORM
 INSIDE BLDG AT INTERSECT. OF COLS B & 4
 VOL III.
 5) SHT P2-1.1 COMPLY W/SEC 714 MAXIMUM
 FIXTURE LOAD ON THE DWV SYSTEM. SHOW
 FIXTURE UNIT LOAD THROUGHOUT SYSTEM. SEC
 104.2 (TALK TO GEORGE HAZAU)
 6) SHT P2-1.3, CAN WASH & TRASH COMPACT-
 OR, CONNECT TO GREASE WASTE. LOCAL ORD
 #2938-96. STK DIAG. "H" SANT SHOWS CAN
 WASH STILL ON SANT. SHT P3-2.3
 7) SHT P3-2.2, STACK "D", "Q" PLBG. FIX-
 TURES FROM UPPER FLOORS SHALL NOT DIS-
 CHARGE INTO A BATTERY VENTED BRANCH.
 SHOW UPPER FLOOR DISCHARGING INTO SEPAR-
 ATE 4" LINE THAT FLOOR DRAINS ARE DRAIN-
 ING INTO.
 8) SHTP3-2.1 THRU P3-2.4 STK DIAGRAMS.
 STK "D" ISOMETRIC DOES NOT MATCH FLAT
 DRAWING, FLOOR DRAIN BY D.F. ARE ALL FD
 VENTS TYPICAL IN REST ROOMS?
 9) SHOP DRAWING SHALL BE PROVIDED FOR
 THE U/G UTILITY SERVICE BOX FROM THE
 MANUFACTURE TO SHOW HOW THERE IS NOT A
 CROSS CONNECTION OF WASTE AND POTABLE
 WATER SEC 601.5 AS REQUESTED IN PREVIOUS
 REVIEW.
 GAS PERMIT REQUIREMENTS
 10) GAS ISOMETRIC ON SHT P4-1.3 HEADER
 IN KITCHEN TO BE UNIFORM. SHOWS 4" TO 3"
 TO 2-1/2" THEN BACK TO 4". ALSO SEDIMENT
 TRAP SHALL BE UPSTREAM OF EQUIPMENT NOT
 AND END OF LINE AS SHOWN.
 11) CALCULATIONS FOR COMBUSTION AIR.
 SHOW COMBUSTION AIR FOR BOILER AND CALCS
 WATER HEATERS DIRECT VENT THRU ROOF NOT
 SHOWN.
 12) INDICATE DELIVERY PRESSURE. FPU
 DELIVERS 12" TO 14" WC - .5 PSI
 13) SUBMIT DETAIL SHOWING THE TYPE, SIZE
 LOCATION, AND TERMINATION OF GAS VENTS.
  
 REVIEW BY PAUL SCHMITZ/KEN STEVENS
 (561) 659-8096 EXT. 8233/8377