Plan Review Notes For Permit 01071485
Permit Number 01071485
Review Stop FIRE
Sequence Number 1
Notes
Date Text
2001-08-10 00:00:001) PLEASE BE ADVISED THAT THIS BUILDING
 IS LOCATED WITHIN THE CITY FIRE LIMITS.
 CERTAIN RESTRICTIONS APPLY.
 2) PLEASE BE ADVISED THAT CITY CODE
 SECTION 11-73 PROHIBITS THE USE OF
 OPEN FLAME DEVICES IN PUBLIC ASSEMBLY
 OCCUPANCIES.
 3) PLEASE INDICATE COMPLIANCE WITH
 PRESCRIPTIVE CODE REQUIREMENTS OF NFPA
 101, 2000 EDITION.
 4) STILL HAVE NOT RECEIVED LETTER
 REGARDING THE NON USE OF PYROTECHNICS
 WITHIN THE BUILDING.
 5) FIRE HYDRANTS NOT SHOWN ON SITE PLAN.
 ADDITIONAL FIRE HYDRANTS HAVE BEEN
 AGREED TO BY THE DESIGN TEAM.
 6) OCCUPANT LOAD CHART, LEVEL ONE ON
 PAGE A1-4.1 IS NOT CORRECT. MATH ERRORS
 EXIST.
 7) OCCUPANT LOAD CHART FOR LEVEL TWO
 HAS THE SAME PROBLEM.
 8) VOID SPACE UNDERNEATH MONUMENTAL
 STAIR ON PAGE A2-1.1, CONFIRM USE IF
 ANY.
 9) PLEASE EXPLAIN USE FOR OVERHEAD DOORS
 IN RATED FIRE WALLS. WHEN OPENED HOW
 DO THESE DOORS CLOSE AUTOMATICALLY.
 ARE SMOKE DETECTORS TIED INTO THESE
 DOORS. PRODUCT APPROVALS NEEDED FOR ALL
 OVERHEAD FIRE DOORS. DOWN ON ALL ALARMS.
 10) PLEASE EXPLAIN OPPOSING DOORS NEAR
 CHILLER PLANT.
 11) PLEASE EXPLAIN USE OF PANTRY.
 12) EXPLAIN 16'-0 HIGH SLIDING METAL
 DOORS. HOW DO THEY SLIDE WITHOUT
 INTERFERING WITH DOORS USED FOR
 EXITING.
 13) HOW DOES THE 30' HIGH OPERABLE
 PARTITION WALL WORK.
 14) PLEASE EXPLAIN ONE HOUR RATED
 CONTINOUSLY HINGED OPERABLE WALL,
 MEETING ROOM 1E-13.
 15) FRT PLYWOOD TO 6'-0 AFFF IN SERVICE
 CORRIDOR 2N-28 IS USED FOR WHAT.
 16) PROPOSED FURNITURE LAYOUT IN
 PRE-FUNCTION AREAS SHOULD BE SHOWN.
 17) STRETCHED FABRIC WALL SYSTEMS,
 SECOND FLOOR MEETING ROOM ENTRY, PLEASE
 EXPLAIN.
 18) PLEASE PROVIDE PRODUCT APPROVALS
 FOR TRANSOMS 1 1/2 HOUR LABELED
 PERFORATED METAL INFILL PANELS.
 19) PLEASE PROVIDE INTERIOR FINISH
 CLASSIFICATION INFORMATION FOR CEILINGS,
 WALLS, AND FLOORS. ALSO FLAME SPREAD
 INFORMATION REQUIRED FOR ANY CURTAINS,
 ETC.
 20) PLEASE INDICATE TACTILE SIGNAGE FOR
 EXIT DOORS.
 21) WHY ARE THERE NO FIRE ALARM
 EQUIPMENT WITHIN TRANSFORMER ROOM.
 22) PLEASE INDICATE WHAT THE EMERGENCY
 VOICE EVACUATION MESSAGE WILL SAY.
 23) ALL HOODS USED FOR THE COOKING THAT
 PRODUCES SMOKE OR GREASE LADEN VAPORS
 ARE TO BE CONNECTED TO THE BUILDING'S
 FIRE ALARM SYSTEM.
 24) NO SPEAKER STROBES NOTED IN LOADING
 DOCK W-07.
 25) STORAGE ROOM 2E-30 HAS NO SMOKE
 DETECTOR IN IT LIKE OTHER ONES.
 26) SEPARATE PLANS AND PERMITS REQUIRED
 FOR THE INSTALLATION OF THE FIRE ALARM
 SYSTEM.
 27) GAS INSTALLATION TO COMPLY WITH
 NFPA 54. PLEASE NOTE THIS ON THE
 DRAWINGS.
 28) WHY ARE CO2 EXTINGUISHERS PLANNED
 FOR SOME SECTIONS INSTEAD OF ABC TYPES.
 29) 8" FIRE LINE SHOWN RUN UNDERFLOOR
 IS NOT ALLOWED TO BE INSTALLED IN THIS
 MANNER.
 30) PLEASE SHOW DRAFT CURTAINS AND
 CLOSELY SPACED FIRE SPRINKLER HEADS
 TO PROTECT ESCALATOR OPENINGS.
 31) NO FIRE SPRINKLER PROTECTION SHOWN
 FOR BANQUET STORAGE 2W-14.
 32) THIS OFFICE WOULD ENCOURAGE THE USE
 OF A COMPLETE WET PIPE FIRE SPRINKLER
 SYSTEM FOR THE BUILDING INSTEAD OF SOME
 AREAS HAVING PRE-ACTION SYSTEMS DUE
 TO FUTURE MAINTENANCE ISSUES.
 33) FIRE MARSHAL SPELLED INCORRECTLY
 ON SIGN DRAWINGS ON G3.1.0.
 34) PLEASE PROVIDE A TYPICAL ARRANGEMENT
 FOR THE EXHIBIT HALL.
 35) PLEASE CLEARLY IDENTIFY EMERGENCY
 LIGHT FIXTURES IN 1E-36 AND EXHIBITION
 HALL.
 36) FIRE SPRINKLER PROTECTION REQUIRED
 IN FIRE PUMP ROOM.
 37) A HOSE CABINET IS SHOWN IN STORAGE
 ROOM 1N-48.
 38) HOW DOES THE EXIT DOORS, SOUTH ENTRY
 LOBBY WORK WHEN PHASE TWO IS STARTED.
 39) ARE THERE ANY FOOD SERVICE DEVICES
 PLANNED FOR THE EXHIBITION HALL THAT
 WOULD PRODUCE SMOKE OR GREASE LADEN
 VAPORS. IF THEY DO COMPLIANCE WITH
 NFPA 96 WOULD BE REQUIRED IN THE
 CONCESSION AREAS.
 40) AFTER ANOTHER REVIEW OF THE
 EXHIBITION HALL IT WOULD APPEAR THAT
 ADDITIONAL EXIT SIGNAGE IS NEEDED ON THE
 WEST SIDE OF IT.
 41) SMOKE EVACUATION SYSTEM CALCULATION
 FOR TOTAL VOLUME IS INCORRECT. BASED
 ON INFORMATION SUPPLIED, IT SHOULD
 READ 1,975,868 INSTEAD OF 1,975,328.
 42) HOW WILL THE SMOKE EVACUATION
 SYSTEM BE IMPACTED FOR PHASE ONE, WHEN
 THE FUTURE PHASE TWO CONSTRUCTION IS
 FINISHED.
 43) PLEASE DEFINE "OPERATOR" WHO WILL
 BE CAPABLE OF OVERRIDING THE SYSTEM AND
 PLACING THE SYSTEM INTO ANY MODE AT
 ANY TIME.
 44) PLEASE EXPLAIN WHY NO MANUAL
 OPERATION WILL CAUSE THE SMOKE EXHAUST
 SYSTEM TO OPERATE.
 45) THE BUILDING MANAGEMENT SYSTEM SHALL
 NOT BE CAPABLE OF EVER OVERRIDING THE
 REQUIRED FIRE ALARM SYSTEM OR SMOKE
 EXHAUST SYSTEM FOR THE ATRIUM.
 46) RECENTLY, IT WAS EXPLAINED THAT
 EXHUAST FANS ARE PLANNED FOR THE EXHIBIT
 HALL. WILL THESE DEVICES BE ABLE TO BE
 BUMPED ON BY FIRE RESCUE TO EXHAUST
 SMOKE OR POSSIBLE PYROTECNIC RESIDUE IF
 APPROVED BY FIRE RESCUE.
 47) PLEASE INDICATE WHAT THE WARNING
 SIGNAGE FOR THE CHILLER PLANT WILL SAY
 AND WHAT LOCATIONS WILL THEY BE PLACED.
 48) NO FIRE SEPARATION SHOWN ON WALL
 BETWEEN LOADING DOCK AND WEST WALL
 OF EXHIBIT HALL. ALSO THE SECOND FLOOR
 SAME LOCATION. SOUTH WALL ALSO.
 49) PLEASE EXPLAIN SIDELIGHTS SHOWN FOR
 WALLS ON A5-1.1.
 50) HOW IS EXITING GOING TO BE DEFINED
 FROM THE ASSEMBLY TO THE LOADING DOCK
 AREA.
  
 MIKE CARSILLO, CAPTAIN
 659-8096,EXT.8497
 835-2910