| Plan Review Notes For Permit 01070541 |
| Permit Number |
01070541 |
|
| Review Stop |
ENG |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2001-07-12 00:00:00 | FAILED: | | | 1. PLEASE SUBMIT STORM WATER CALCULATION | | | FOR OUR REVIEW AND APPROVAL. | | | 2. PLEASE INCLUDE DETAILS FOR THE | | | PROPOSED DRY RETENTION POUND. | | | 3. PLEASE PROVIDE POLLUTION PREVENTION | | | PLAN FOR ENTIRE SITE. | | | 4. A CLEAN-OUT WILL NEED TO BE INSTALLED | | | IN THE SANITARY SEWER LATERAL, ON THE | | | PROPERTY, AT THE BACK OF THE SIDEWALK. | | | 5. PLEASE VERIFY IF THERE IS AN EXISTING | | | HYDRANT IN FRONT OF PROPOSED DRIVEWAY | | | ENTRANCE. | | | 6. IF GARBAGE IS TO BE PICKED UP BY THE | | | CITY, THE DUMPSTER ENCLOSURE SHOULD HAVE | | | A MINIMUM OF 12'-6" CLEAR BETWEEN THE | | | GATE POSTS AND IT SHOULD BE 12'-6" WIDE | | | AND 12' DEEP. | | | 7. PLEASE COORDINATE WITH PUBLIC | | | UTILITIES ENGINEERING SERVICES FOR ALL | | | THE NEW CONNECTIONS TO THE CITY SERVICES | | | ,659-8040. | | | 8. A SEPARATE DEP PERMIT WILL BE | | | REQUIRED. | | | 9. A DETAILED REVIEW WILL BE DONE AT THE | | | TIME OF ACTUAL PERMITTING, AND WHEN CIVL | | | PLANS ARE COMPLETEY DEVELOPED. | | | | | | IF ANY QUESTIONS PLEASE CONTACT 659-8096 | | | EXT. 8492 MOHAMMAD R. AMINI |
|