| Plan Review Notes For Permit 01060531 |
| Permit Number |
01060531 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2001-06-20 00:00:00 | SHEET C1 YKK AMERICA CITES ASCE 7-93 | | | WITH AN 110 MPH WIND SPEED.THE 1997 | | | SBC AND THE PERMITTED PLANS CITE ASCE | | | 7-95 WITH 145 MPH. | | | | | | THE PERMITTED PLANS CALL OUT WIND | | | PRESSURES OF + 67.1 AND - 67.6 FOR THE | | | INTERIOR ZONES AND + 67.1 AND - 122.0 | | | FOR THE EDGE ZONES. | | | | | | A LETTER FORM THOMAS TWOMEY, PE DATED | | | 5/21/2001 STATES THAT HE REVIEWED YKK | | | CALCULATIONS AND THAT THEY WILL MEET | | | 110 MPH.WHAT RELEVANCE IS THIS TO THIS | | | PROJECT? | | | | | | THE MIAMI DADE NOTICE OF ACCEPTANCE | | | #01-228.09 INCLUDED IS MISSING THE | | | DRAWINGS NOTED UNDER SPECIFIC CONDITION | | | 2.1 AND 6.1.2 OF THAT REPORT. | | | | | | THE NOTICE ACCEPTANCE REPORT IS FOR | | | SERIES YHC 300 OG,THE YKK AMERICA | | | PLAN SHEET S1 SPEAKS TO YHS 50 ALSO. | | | MISSILE IMPACT RESISTANCE TESTING IS | | | REQUIRED FOR THAT SYSTEM TOO. | | | | | | ALL GLAZING MUST HAVE TEST REPORTS FOR | | | MISSILE IMPACT.ONLY WINDLOAD | | | COMPLIANCE MAY BE BY RATIONAL ANALYSIS | | | AS PROVIDE FOR IN THE CITY'S HURRICANE | | | MISSILE IMPACT POLICY. |
|