| 2001-07-02 00:00:00 | *************BUILDING UNSAT************* |
| | |
| | 1) A RECORDED COPY OF THE NOTICE OF |
| | COMMENCEMENT MUST BE SUBMITTED BEFORE A |
| | PERMIT CAN BE ISSUED. |
| | |
| | 2) PROVIDE (2) COPIES OF MANUAL J |
| | CALCUALTIONS AS REQUIRED BY THE FLORIDA |
| | ENERGY EFFICIENCY CODE. |
| | |
| | 3) DETAIL A3 IS MISLABELED AS A4 ON |
| | SHEET 3A. PLEASE CORRECT. |
| | |
| | 4) INDICATE REQUIRED TIE BEAMS FROM THE |
| | SCHEDULE FOR THE FRENCH DOORS AND |
| | SLIDING GLASS DOORS THAT OPEN ONTO THE |
| | LANAI. (SEE SHEET 3A) |
| | |
| | 5) INDICATE THE CONNECTIONS FOR GIRDER |
| | FG1 TO THE COLUMNS AT THE LANAI. |
| | |
| | 6) INDICATE THE CONNECTORS FOR GIRDER |
| | HG7 AND TRUSS T8 ON SHEET 3A. |
| | |
| | 7) PROVIDE REVISED STORM PANEL KEY PLAN |
| | AND INSTALLATION SCHEDULE THAT |
| | CORRESPOND TO THE OPTIONS THAT ARE GOING |
| | TO BE USED. |
| | |
| | NOTE: STRUCTURE IS LOCATED IN AN "A" |
| | FLOOD ZONE AN ELEVATION CERTIFICATE WILL |
| | BE REQUIRED. |
| | |
| | TRUSSES |
| | UNSAT |
| | |
| | 1) THE MEAN ROOF HEIGHTS GIVEN ON THE |
| | TRUSS DRAWINGS DIFFER FROM EACH OTHER |
| | AND DO NOT CORRESPOND WITH THE MEAN ROOF |
| | HEIGHT OF THE STRUCTURE (17FT.). PLEASE |
| | CORRECT. |
| | |
| | 2) THE DESIGN CRITERIA LISTED ON THE |
| | TRUSS DRAWINGS SHOULD BE 1997 STANDARD |
| | BUILDING CODE (SBC) AND NOT THE SBCCI, |
| | WHICH IS AN ORGANIZATION. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)659-8096 EXT.8202 |