| 2001-05-29 00:00:00 | PLUMBING PLAN REVIEW"DENIED" |
| | (1) SHT-1 NUMBER ROOMS,AS PER FINISH |
| | SCHEDULE ON SHT-2. |
| | (2) SHT 1 EXISTING REST RM'S MEN'S |
| | WOMEN'S,COMPLY W/FACBC 97 SEC 4.16(2) |
| | ALTERATIONS TO AN AREA CONTAINING A PRIM |
| | ARY FUNCTION, THE PATH OF TRAVEL AND THE |
| | REST RM'S SERVING THE ALTERED AREA, |
| | ARE READLY ACCESSIBLE AND USEABLE BY |
| | INDIVIDUALS WITH DISABILITIES. |
| | SHOW CALCULATIONS FOR A BEAUTY SHOP.FOR |
| | MINIMUM FACILITIES,SPC 94 SEC 407.1.3 |
| | (3) ALL REST RM FACILITIES IN COMMON |
| | AREA TO COMPLY W/FACBC 97 SEC 4.1.3.(11) |
| | (4) BREAK RM SINK TO COMPLY W/FACBC |
| | 4.24.2,4.24.5 HEIGTH,KNEE CLEARANCE. |
| | (5) SHT 8 SEE GAS PERMIT APPLICATION |
| | REQUIRMENTS ATTACHED, ADDRESS EA ITEM. |
| | (6) SHT-8 FUTURE F/D TO HAVE A DEEP |
| | SEAL TRAP OR TRAP PRIMER SPC 97 409.1.1 |
| | (7) SHT-8 2" CROSS NOT PERMITED ON A |
| | WASHING MAHINE WASTE,SEC 409.12.3 |
| | (8) SHT-8 WATER SUPPLY, NO MORE 2 PLBG |
| | FIXTURES SHALL BE SUPPLIED W/ 1/2" COLD |
| | WATER SUPPLY, NO MORE THAN 4 PLBG. |
| | FIXTURES SHALL BE SUPPLIED W/ 1/2" HOT |
| | WATER SUPPLY. SEC 607.7 PBC AMEND SPC 94 |
| | (9) SHT-8 DWV ISOMETRIC,SHOW ALL PIPE |
| | SIZES.SPC 94 SEC 104.3 |
| | (10) WATER SUPPLY,EA TENANT SPACE TO |
| | HAVE A SEPERATE BACK FLOW PREVENTER. |
| | SPC 94 SEC 606. |
| | (11) SHT-8 PROVIDE CUT SHTS ON WASHING |
| | MACHINES,TO SHOW THAT A LINT SEPERATOR |
| | IS NOT REQUIRED.SPC 94 SEC 1004.10.1 |
| | END OF COMMENTSPAUL SCHMITZ |