| Plan Review Notes For Permit 01041075 |
| Permit Number |
01041075 |
|
| Review Stop |
P |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2001-10-28 00:00:00 | PLUMBING PLAN REVIEW, DENIED | | | (1) SHT P-3-4GREASE TRAP REFERENCE, | | | GREASE TANKS TO BE PIPED PARALLEL NOT | | | IN SERIES. | | | (2) SHT P-2 WATER PIPING ISOMETRIC SHOW | | | A REERENCE FOR WATER HAMMER ARRESTORS, | | | INSTALLED PER.MFG FOR PLACEMENT AND | | | LOCATION,SEC 607.8, PDI-WH201, ASSE 1010 | | | (3) SHT P-2 GAS PIPING ISOMETRIC L-P GAS | | | CODE REFERENCE FOR L-P GAS IS NFPA-54-99 | | | LIQUIDFIED PETROLEM, TAB 12.1 TANK TO | | | METER, TAB 12.3 SECOND STAGE REGULATOR | | | TO APPLIANCE. | | | TOTAL DEVELOPED LGTH SHALL BE FROM L-P | | | TANK TO METER, METER TO THE FARTHEST | | | APPLIANCE. | | | PIPING AS SHOWN IS OVER SIZED. | | | SPECIFICATIONS CALL FOR ALL BLK STEEL | | | PIPING TO BE WELDED, REGARDLESS OF SIZE? | | | END OF COMMENTS PAUL SCHMITZ | | | QUESTIONS 5610659-8096X8233 |
|