| Date |
Text |
| 2001-08-02 00:00:00 | SHEET S1 OF THE PUBLIX PLANS DESIGN |
| | CRITERIA CALLS OUT CONFLICTING |
| | INFORMATION FOR THE WIND.SEE SBC |
| | 1606.1.2.1 RE: MIXING OF WINDLOADS. |
| | THE ENTIRE BUILDING, INCLUDING THE |
| | RETAIL WINGS, MUST BE DESIGNED TO ONE |
| | STANDARD.EITHER ASCE 7-95 OR SBC |
| | 1606.2.WEST PALM BEACH IS IN THE 140 |
| | MPH VELOCITY ZONE FOR ASCE 7-95 AND 110 |
| | MPH FOR SBC 1606.2. NOT THE 100 MPH |
| | DECLARED. |
| | |
| | PLEASE INCLUDE CALCULATIONS |
| | DEMONSTRATING COMPLIANCE WITH ONE OF |
| | THE ABOVE.ALSO WHICH IS THE DESIRED |
| | SOIL BEARING PRESSURE,2000 PSF OR 2500 |
| | PSF? |
| | |
| | THE FP1 HAS A STATEMENT THAT SAYS SEE |
| | THE ARCHITECTURAL PLANS FOR THE CANOPY |
| | SPRINKLER DESIGN.THE ARCHITECTURAL |
| | PLANS DO NOT SHOW ANY FIRE SPRINKLER |
| | DESIGN. |
| | |
| | NFPA 13 SS 4-5.7.1 REQUIRES SPRINKLERS |
| | FOR THIS APPLICATION AND CHP. |
| | 61G15-32.003 COMMON REQUIREMENTS TO ALL |
| | FIRE PROTECTION ENGINEERING DOCUMENTS |
| | FBPE,SET OUT SPECIFIC INFORMATION FOR |
| | DOCUMENT SUBMITTAL.PLEASE REVISE AS |
| | NECESSARY. |
| | |
| | PLEASE INDICATE THE PORTIONS OF THE |
| | BILDING THAT WILL HAVE HURRICANE |
| | SHUTTERS AND WHICH WILL HAVE IMPACT |
| | RESISTANT GLASS? |
| | |
| | SEE THE PREVIOUS CHECKLISTS REGARDING |
| | IMPACT FEES AND A RESIDENT INSPECTOR. |