| Plan Review Notes For Permit 01040480 |
| Permit Number |
01040480 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2001-05-10 00:00:00 | PERMIT 01040480 - 609 EXEC. CTR. DR. | | | PERMIT 5 STORY, PLAN REFLECT 3 STORY | | | | | | | | | 1.DRYER SUBDUCT NEEDS TO INDICATE | | | ACCESS FOR CLEANOUT. | | | | | | 2.DRYER SUBDUCT NEEDS TO INDICATE | | | MEANS OF FIRE PROTECTION AS PER | | | NFPA 13 4-4.8. | | | | | | 3.GALV. STL. SUBDUCT FOR DYER VENT | | | & TOILET EXHAUST - IS INSIDE OF | | | SUBDUCT GALVENIZED? | | | | | | 4.DRAWING A6.0 DEPICTS AHU AND WATER | | | HEATER CLOSET,AHU MUST HAVE CLEAR | | | ACCESS FOR REPLACEMENT OF AHU & | | | FOR CONECTION OF DUCT TO UNIT AS | | | WELL AS FOR INSPECTION. | | | | | | 5.CONDENSATE TO DRYWELL OKAY, WHAT | | | ABOUT OVERFLOW PROTECTION FOR | | | AUXILIARY DRAIN PAN AS PER 1997 | | | SMC 304.8.6.1.(DWG P-2) | | | | | | 6.PLEASE SUBMIT DETAIL OF CONDENSER | | | UNIT STANDS,MINIMUM OF 18" FROM | | | ROOF SURFACE TO BOTTOM OF SUPPORT | | | RAIL (AMENDED 1997 SMC 304.2.5) | | | DETAIL MUST BE AN ENGINEERED | | | DRAWING.(UPLIFT/WINDLOAD AND | | | HOW TO ATTACH TO ROOF STRUCTURE.) | | | | | | 7.NO DETAIL FOR THE ELEVATOR SHAFT | | | IS INCLUDED.(VENTILATION/FIRE | | | PROTECTION 1997 SBC 3003.6) |
|