Plan Review Notes
Plan Review Notes For Permit 01031299
Permit Number 01031299
Review Stop B
Sequence Number 1
Notes
Date Text
2001-04-03 00:00:00PROVISO:
 PHASE 1
 GEE & JENSEN
 1)- SHEET 4 DETAIL B/C INDICATES FENCE
 POST BUT NOT CLEAR AS TO FENCING MATER-
 IAL. GAURDRAILS ARE REQUIRED(SBC 1022.4)
  
 PHASE II
 MOCK . ROOS
 1)- PUMP STATION: STRUCTURAL CONTROL
 HOUSE, STANDARD BUILDING CODE 1997,
 CORRECT DATEON : DESIGNED TO MEET
 ASCE 7-95.WALL & ROOF WINDSPEED 110 MPH.
 A)- FABRICATED BUILDINGS REQUIRE
 SIGNED & SEALED ENGINEER DRAWINGS
 ARE REQUIRED FOR FABRICATED BUILD
 INGS.
 B)- FOUNDATION DETAILS?
  
 2)- CHEMICAL STORAGE BUILDING:
 PLANS INDICATE THAT A PREFABRICATED
 METAL BUILDING WILL BE REQUIRED.
 PREFABRICATED METAL STRUCTURES WILL
 REQUIRE SIGNED & SEALED ENGINEERED
 DRAWINGS BEFORE PEMITTING.
  
 BUILDING PLAN REVIEW
 JIM WITMER
 (561) 659-8096 EX 8412


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved