| Date |
Text |
| 2001-03-29 00:00:00 | O/B SIMMONS, RONALD |
| | 369 PALMETTO ST |
| | PERMIT # 01030543 |
| | |
| | 1)- SBC 104.2.2 ADDITIONAL INFORMATION |
| | : SURVEY REQUIRED (2 COPIES) A RECENT |
| | SURVEY WITH IN A YEAR OLD. |
| | |
| | 2)- DISCREPANCY BETWEEN THE ENERGY SHEET |
| | ATTIC INSULATION R-30 VS. SHEET A2 R-19. |
| | |
| | 3)- STATE MEMORANDUM 692; PRE CONSTRUC- |
| | TION SOIL TREATMENT FOR SOIL,SBC.103.7.- |
| | 3.3.5 ADDITIONAL SOIL TREATMENTSHALL BE |
| | APPLIED UNDER ALL EXTERIOR CONCRETE ON |
| | GRADE WITHIN (1) FOOT OF THE PRIMARY |
| | STRUCTURE SIDEWALLS (PATIO). |
| | |
| | 4)- SBC 1606.2.6.2 COMPONENTS & CLADDING |
| | ALL GLAZED OPENINGS (WINDOWS & DOORS) |
| | ARE REQUIRED TO WITH TESTING FOR WIND, |
| | A 10 SECOND PERIOD AT LOAD EQUAL TO 1.5 |
| | TIMES THE DESIGN PRESSURE (1707.4). |
| | |
| | 5)- SBC 1707.5 CONCRETE ROOF TILE, |
| | REQUIRES TESTING FOR RESISTANCE FOR OVER |
| | TURNING IN ACCORDANCE WITH THE SBCCI |
| | SSTD 11, THE CITY ACCEPTS SBCCI REPORTS |
| | OR DADE COUNTY PRODUCT APPROVALS. |
| | |
| | 6)- SBC 1606.4.1/1707.4.1.: GLAZED OPEN- |
| | INGS REQUIRE PRODUCT TESTING FOR LARGE |
| | MISSLE RESISTANCE TESTING OR STORM |
| | SHUTTERS THAT HAVE BEEN TESTED, A COPY |
| | OF THE CITIES POLICY IS ENCLOSED,WITH A |
| | SAMPLE SCHEDULE. THE DESIGN CERTIFICA- |
| | TION SHEET INDICATES THAT THIS REQUIRE- |
| | MENT WILL BE "BY OTHERS". A SEPERATE |
| | PERMIT & FEES WILL BE ASSESSED IF THIS |
| | REQUIREMENT IS MET AFTER THE ISSUANCE OF |
| | THE BUILDING PERMIT. |
| | |
| | 7)- PLANS WILL BE REQUIRED TO HAVE |
| | COUNTY IMPACT FEE STAMPS BEFORE THE |
| | ISSUANCE OF THE PERMIT. |
| | |
| | 8)- STATE RADON CHARGES OF $5.68 WILL BE |
| | ASSESSED BY THE CITY. |
| | |
| | BUILDING PLAN REVIEW |
| | JIM WITMER |
| | (561) 659-8096 EX 8412 |