| 2001-03-09 00:00:00 | PASSED WITH PROVISOS: | | | 1. ALL DRIVEWAY MUST BE CONSTRUCTED PER | | | CITY OF WPB STANDARD. | | | 2. ALL BROKEN SIDEWALKS,CURBS (&GUTTERS) | | | ALONG THE PROPERTY (ALL SIDES) SHOULD BE | | | REPLACED. | | | 3. CALL OUT THE CONFLICT POINTS WHERE | | | WATER CROSSING THE SEWER LINES AND SHOW | | | THE CLEARANCES. | | | 4. CONTRACTOR SHOULD COORDINATE WITH | | | PUBLIC UTILITIES ENGINEERING SERVICES | | | TO EVALUATE THE CONDITION OF THE | | | METR VAULT AND RESTORE TO GOOD CONDITION | | | AT NO COST TO THE DEPARTMENT. | | | 5. ANY IRRIGATION SYSTEM DISTRUPTED | | | BY CONSTRUCTION SHALL BE REPAIRED AND | | | OR REPLACED AT THE CONTRACTORS EXPENCE. | | | 6. ANY LANDSCAPE DISTRUPTED BY CONSTRUCT | | | ION SHALL BE REPAIRED AND OR REPLACED | | | AT THE CONTRACTORS EXPENSE. | | | 7. LANDSCAPE SHALL BE INSTALLED IN ACCO- | | | RDANCE WITH THE CLEAR VISION | | | REQUIREMENTS OF ARTICAL X, SECTION | | | 33-112 (E). |
|