| Date |
Text |
| 2001-02-07 00:00:00 | PLUMBING PLAN REVIEWDENIED |
| | REFERENCES: SPC 94, FACBC 97,NFPA 99-C |
| | (1) SHT A-3 DR'S REST RM TO BE H/C |
| | ADAPTABLE SEC 4.1.3(11) |
| | (2) SHT A-9 SEC 1109 SEPERATE DRAINAGE |
| | SYSTEM FROM THE SECONDARY SYSTEM SHALL |
| | BE REQUIRED, PROVIDE ISOMETRIC WITH PIPE |
| | SIZES, CALCULATIONS, TYPE OF MATEREIAL. |
| | (3) SHT A-3 MINIMUM FACILITIES BASED ON |
| | TAB 407 ON NUMBER OF FIXTURES FOR MEN |
| | WOMEN REST ROOMS REQUIRED. |
| | (4) SHT P-5 WATER HEATER ON SHELF,2ND X |
| | SHOW A DETAIL OF THE WORKING PLATFORM |
| | WITH A FIXED SHIPS LADDER FIXED IN |
| | PLACE. SEC 501.7 |
| | (5) SHT A-11 SHOW A DETAIL OF THE BREAK |
| | RM SINK, ELV.34",CLEAR FLR SPACE 30"X48" |
| | KNEE CLEARANCE 19". |
| | (6) SHT P-3 AIR CHAMBERS TO BE READLY |
| | ACCESSIBLE AND RECHARGEABLESEC.607.8.3 |
| | (7) SHT P-3 BACK FLOW PREVENTER REQUIRED |
| | ON WATER SERVICE, ALL DENTAL EQUIPMENT. |
| | SEC. 601.1 |
| | (8) SHT P-4 SEC 104.3 EXAMINATION OF |
| | DOCUMENTS. SUBMIT DATA ON ALL DENTAL |
| | EQUIPMENT,INCLUDING X RAY PROCESSOR. |
| | (9) SHT P-4 VACUM PUMP DRAIN TO BE |
| | DIRECTLY CONNECTED TO SANITARY SYSTEM. |
| | VENT VACUM PUMP SEPERATLY OUTSIDE. |
| | SEC 4-5.2.1.3 & 4-5.2.1.4 |
| | (10) SHT P-4 VACUM DISTRIBUTION SYSTEM, |
| | SHOW ACCESSIBLE CO'S ON MAINS, BRANCHES |
| | 4-5.2.2 |
| | END OF COMMENTS, QUESTIONS CONTACT |
| | PAUL SCHMITZ 561-659-8096 X 8233 |